Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.2
Permit Number - TD-DEV-1122-00015
Review Name: DEVELOPMENT PACKAGE REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/07/2023 | Site Landscape | APPROVED | |||
05/05/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
05/02/2023 | Site Engineering | REQUIRES RESUBMIT | 1. Previous comment 1 not addressed. Per City Code chapter 15 article III section 15.10.1.E - Each dwelling unit must have a minimum of forty-five (45) gallons of refuse container capacity available for use during the period between scheduled collection services. The director may waive capacity standards on a case-by-case basis. With 52 units proposed that would be 2340 gallons per week or 11.6 cubic yards per week. 2. According to recent clarification from Environmental Services, per TSM section 8-01, although recycling service isn’t required the site does need to provide at minimum the enclosure space for both solid waste and recycling. So, a single enclosure won’t be sufficient and a double enclosure or an additional single enclosure will be needed to meet this requirement. It is also important to point out per TSM section 8-01.4.I - required parking may be reduced for existing development when solid waste and recycle enclosures are provided. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
04/28/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: 1742 North Oracle Road – Multi-Family Development Package (2nd Review) TD-DEV-1122-00015 TRANSMITTAL DATE: April 28, 2023 DUE DATE: April 27, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is November 01, 2023. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 1. Until the TSMR is approved Zoning cannot approve the DP. COMMENT: 2-06.4.9.R – There are several sidewalks that do not meet the 4’-0” width requirement, TSM Section 7-01.4.3.A: 3.7’ south side of Building #1, west side of Building #2, northwest end of Building #5, south side of Building #8 If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
05/05/2023 | TSMR/PDMR - Zoning | REQUIRES RESUBMIT | The request to reduce the width of the parking spaces and driveway are approved. However, Zoning will not support a pedestrian path under 4ft without identifying unique site constraints. It appears the proposed structures can be shifted slightly to allow for an unobstructed 4ft sidewalk in all areas. Under no circumstances will a pedestrian path under 3ft be approved. | ||
04/21/2023 | Fire New Construction | REVIEW COMPLETED | |||
05/02/2023 | TSMR/PDMR - Engineering | REVIEW COMPLETED |