Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-1026-00272
Parcel: 11007414K

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-1026-00272
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/02/2026 CDRC Post Review Express PENDING ASSIGNMENT
11/02/2026 CDRC Review Coordinator Express PENDING ASSIGNMENT
11/02/2026 Commercial Plumbing Standard PENDING ASSIGNMENT
11/02/2026 Fire New Construction Standard PENDING ASSIGNMENT
11/02/2026 NPPO Standard PENDING ASSIGNMENT
11/02/2026 ROW Engineering Review Standard PENDING ASSIGNMENT
11/02/2026 Site Engineering Standard PENDING ASSIGNMENT
11/02/2026 Site Landscape Standard PENDING ASSIGNMENT
11/02/2026 Site Zoning Standard PENDING ASSIGNMENT
10/30/2026 OK to Submit - Engineering Fast REQUIRES RESUBMIT Permit Activity Number: TD-DEV-1026-00272 (OK to Submit Review)
Project: NEW BURGER KING DRIVE-THRU AT NORTHGATE PLAZA SHOPPING CENTER
Location: 2402 N ALVERNON WY
Review Date: 10/30/2026
Reviewer: Marco Contreras – Engineering Associate
Reviewer Contact Information: marco.contreras@tucsonaz.gov
Related cases:

Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.
The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Review Comments:
NOTICE: This is a completeness check review performed by both Site Engineering & Zoning to determine whether the submission in question is sufficient for full review by all applicable reviewing parties. As such, do not interpret the provided comments as finalized complete review comments. They are simply to address outstanding issues caught at this stage of submission.

1. Application incomplete, please provide the following items for resubmission:
a. Provide a drainage report demonstrating compliance with applicable drainage requirements such as Balanced basin detention & First-flush retention, as well as demonstrating the function & design of the proposed site.
i. The following references from the Standards Manual for Drainage Design and Floodplain Management (COT Drainage Manual) and the Design Standards for Stormwater Detention and Retention Manual (DSSDR) shall govern report preparation:
1. Report Formatting & Content: COT Drainage Manual §2.3; DSSDR Chapter 10
2. Flood Peak Estimation: COT Drainage Manual Chapter 4
3. Erosion Hazard Assessment: COT Drainage Manual Chapters 6 & 7
4. Drainage Facility Design Standards: COT Drainage Manual Chapters 9–11
5. First-Flush Retention & Detention Guidelines/Triggers: DSSDR Chapters 2, 3, & 4
b. Please provide an Earthwork table - Cut and fill quantities, including total area of disturbance (sq. ft.) and earthwork volumes
c. Geotechnical Report – A site-specific geotechnical investigation report prepared by a licensed geotechnical engineer is required [IBC 1803]. The report shall address soil bearing capacity, site classifications, expansive soils, groundwater conditions, necessary drainage infrastructure setbacks, and any recommendations for foundation design as applicable to the proposed construction.
10/28/2026 CDRC Application Completeness Express REVIEW COMPLETED
11/02/2026 OK to Submit - Zoning Fast REVIEW COMPLETED