Permit Number: TD-DEV-1025-00260
Parcel: 11305054B

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-1025-00260
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/04/2026 Site Engineering Standard APPROVED
02/27/2026 NPPO Standard NOT REQUIRED
02/27/2026 Site Landscape Standard NOT REQUIRED
02/24/2026 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM:
Bobby Parsons
PDSD Zoning Review Section

PROJECT:
Replacement of Existing Underground Storage Tanks and Fuel Dispensers
Development Package (1st Review)
TD-DEV-1025-00260

TRANSMITTAL DATE: 2/24/2026
DUE DATE: 2/25/2026

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is February 3, 2027.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

2-06.3.0 FORMAT REQUIREMENTS

CONTENT REQUIREMENTS

2-06.4.2 - The title block shall include the following information and be provided on each sheet:

2-06.4.2.B - A brief legal description and a statement as to whether the project is a re-subdivision are to be provided. On re-subdivisions, provide the recording information of the existing subdivision plat;

1. COMMENT: 2-06.4.2.B – Please include a brief legal description as noted by the standard above.

2-06.4.2.D - The page number and the total number of pages in the package (i.e., sheet xx of xx).

2. COMMENT: 2-06.4.2.D – Please include the page number and total number of pages on each sheet as noted by the standard above.

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

3. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-1025-00260, adjacent to the title block on each sheet.

2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and,

4. COMMENT: 2-06.4.4.B – Identify major streets on your location map as noted by the standard above.

2-06.4.4.C - Section, township, and range; section corners; north arrow; and the scale will be labeled.

5. COMMENT: 2-06.4.4.C – Section, township, and range; and section corners need to be included on the location map as noted by the standard above.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

Zoning and Land Use Notes

2-06.4.7.A.2 - List the gross area of the site/subdivision by square footage and acreage.

6. COMMENT: 2-06.4.7.A.2 – Under general notes, please list the gross area of the site by square footage and acreage as noted by the standard above.

2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan.

7. COMMENT: 2-06.4.7.A.6 – Include a note stating “this project is designed to meet the overlay zone(s) criteria. UDC Article 5.4 Major Streets and Routes Setback Zone (MS&R).

2-06.4.7.A.8 - For development package documents provide:

2-06.4.7.A.8.a - Floor area for each building;

8. COMMENT: 2-06.4.7.A.8.a – Please provide the floor area for each building as noted by the standard above.

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

2-06.4.8.B - All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided.

9. COMMENT: 2-06.4.8.B – As multiple existing easements are called out, please include the recordation information as noted by the standard above.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.A - Draw in all proposed lot lines with approximate distances and measurements.

10. COMMENT: 2-06.4.9.A - A – As this site is made up of two (2) parcels, 11305055B & 11305054B, a lot combination or recorded covenant is required. Either provide the approved lot combination request form or a recorded Covenant Regarding Development and Use of Real Property with your next submittal. Contact Pima County for the Combo Request. The Covenant can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/submission-documents/covenant-regarding-development-and-use-of-real-property-udc-with-release.pdf.

2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. If the property is being rezoned, use those boundaries and classifications. The basis for this requirement is that some zoning requirements on a project are based on the zoning classification of adjacent property. Also, in some instances, each zone has to be taken into consideration on property that is split by two or more zoning classifications, as each may have different requirements.

11. COMMENT: 2-06.4.9.F - Please clearly label the zoning classification on and adjacent to the parcel as noted by the standard above.

2-06.4.9.H.4 - Indicate if existing streets are public or private; provide street names, widths, curbs, sidewalks, and utility locations, all fully dimensioned.

12. COMMENT: 2-06.4.9.H.4 – Indicate if existing streets are public or private as noted by the standard above.

2-06.4.9.L - All proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The easements may have to be recorded and the recordation information added to the development package prior to approval.

13. COMMENT: 2-06.4.9.L – Please see comment 9 as it relates to the existing easements.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations ***

If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
02/03/2026 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added: , TEP, SWG, USPS, and PAG to the workflow. Review request email sent to, TEP and FYI email sent to, SWG USPS PAG
02/24/2026 Commercial Plumbing Standard REVIEW COMPLETED
02/03/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
02/03/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
02/17/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED 4350 E. Irvington Road
Post Office Box 711, Tucson, AZ 85702
February 17, 2026
WO#T175549
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Speedway 2933
TD-DEV-1025-00260
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 2/3/2026. There are existing facilities within the development which are
depicted upon the plan. There are no apparent conflicts at this time.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Churck Leon
(520)
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
02/03/2026 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
02/25/2026 Fire New Construction Standard REVIEW COMPLETED Separate Fire Construction and Fire Operational permits are required for UGST, permits can be applied for on TDC online, and any questions regarding these requirements can be submitted to Jesus Silva, jesus.silva@tucsonaz.gov / 520.837.7094
02/03/2026 OK to Submit - Zoning Fast REVIEW COMPLETED
02/25/2026 ROW Engineering Review Standard REVIEW COMPLETED