Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-1025-00257
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/05/2025 | Site Landscape Standard | APPROVED | |||
| 12/05/2025 | NPPO Standard | NOT REQUIRED | |||
| 11/03/2025 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TD-DEV-1025-00257 Location: 6600 E GRANT RD Review Date: 11/3/2025 Site Engineering Comments: 1. Vehicle separation will be required to prevent vehicles from potentially encroaching into the pedestrian pathway for the southwest ADA parking spaces. This can be accomplished through either using wheel stops like all other parking spots or provide bollards that are a minimum 4 feet spacing or maximum 5 feet clear. These would only need to be placed where the Van stall and lower ADA spot are located for detail 3 on sheet 4. If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 11/06/2025 | Site Zoning Standard | REQUIRES RESUBMIT | Permit: TD-DEV-1025-00257 Location: 6600 E GRANT RD Review Date: 11/6/2025 1. COMMENT: Per UDC Technical Standards Manual 7-01.4.1.F, "Sidewalks or pedestrian refuge areas cannot be located between any motor vehicle parking space and the PAAL providing access to that space". One of the accessible parking spaces in Detail 3 on Sheet 4 do not demonstrate compliance with this standard. 2. COMMENT: Please see Site Engineering comments for additional corrections required. Contact Fernando Garcia at fernando.garcia2@tucsonaz.gov. |
||
| 10/15/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | FYI CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. |
||
| 11/04/2025 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 10/31/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 10/14/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 11/06/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 10/21/2025 | ROW Engineering Review Standard | REVIEW COMPLETED |