Permit Review Detail
Review Status: In Review
Review Details: DEVELOPMENT PACKAGE NEW REVISION v.1
Permit Number - TD-DEV-1024-00278
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| N/A | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 11/16/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-1024-00278 Project: Hillside Grading - SFR Location: 2701 W GORET RD Review Date: 11/16/2026 Reviewer: Joe Macaulay – Civil Engineer – Site Development Reviewer Contact Information: joe.macaulay@tucsonaz.gov Related cases: TC-RES-1026-05857 Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards. The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files. Applicable Code Links for quick/direct reference: City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593 Site Engineering Review Comments: 1. This site is located within the COT Hillside Development Zone (H.D.Z.) and will need to adhere to all code requirements per UDC 5.2 and TSM Section 9-01. 2. Proposed Grading: Show additional proposed contours and/or spot elevations throughout the site, including finished grade elevations at all building corners, backyard areas, and drainage structures. a. Please provide additional grading information for the swale at the west side of the house. 3. Per TSM 2-01.9.3 The top of cut slope shall not be made nearer to a site boundary line than one fifth of the vertical height of cut with a minimum of two feet and a maximum of ten feet. The setback may need to be increased for any required interceptor drains. a. Please provide further existing and proposed grading information for the proposed wall grading to ensure the requirements above are met at the south end of the property. 4. Limits of Disturbance (LOD): Delineate the full extent of all proposed grading, including all drainage-related improvements. a. Please label any drainage related improvements within the plans. 5. Please provide additional plan sheets that reflect the proposed revisions to the layout of the site/building: a. Please provide revised Architectural Site Plan showing new layout of site and building interior. 6. The City of Tucson Inclusive Home Design Ordinance requires all new dwellings — including ADUs, single-family residences, and duplexes — to provide an accessible route connecting the public street, sidewalk, or driveway to an accessible entrance of the home. This pathway must be shown, dimensioned, and labeled on the plans. What this means in plain terms: There needs to be a clearly defined, walkable path from where a person arrives (the street, sidewalk, or driveway) all the way to a usable door of the home — one that someone using a wheelchair or mobility aid could navigate without barriers. An exterior accessible route that shall conform to 2017 ICC A117.1 Sections 402 and 403 and City of Tucson Inclusive Home Design Ordinance. Reference: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/inclusivehomedesignordinance.pdf Action Items — Show the following on your plans: • Draw and label the path as "Accessible Route" • Provide a minimum clear width of 4 feet with a width call-out on the plans • Note the proposed running slope (must not exceed 5% / 1:20) and cross slope (must not exceed 2% / 1:50) • Identify the accessible entrance the route leads to. Acceptable Accessible Route compositions include: • Portland cement concrete (PCC) • Broom Finished concrete • Brick or unit pavers (Only if set on a stable cement base with no gaps exceeding ½”) • Concrete pavers on concrete base (Same joint and evenness requirements as brick) • Flagstone: must be mortared – loose set does not qualify • Any surfaces equivalent in smoothness, hardness, and durability NOTICE: Decomposed granite (DG) is not permitted for required accessible routes, even if compacted 7. As it is unclear of the dimensions and grades around the proposed site wall, a. If retaining walls are proposed, the Geotechnical report shall address lateral earth pressures, backfill requirements, and wall foundation recommendations. b. Provide the following general note: Retaining walls and/or screen walls referenced on this plan are to be designed by others. Elevations shown hereon are for reference only. The contractor shall confirm exact elevations. All retaining/structural walls and/or screen walls require a separate building permit and are not covered under the grading permit for this project. c. If walls greater than 7-feet are proposed, it will be required that a separate structural wall permit with structural calculations/drawings be submitted for construction of the wall. |
||
| 10/16/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 10/23/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | External reviewers are not required. No further action is required from the customer at this time. | ||
| 10/16/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 10/20/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED |