Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-1023-00428
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/07/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 05/07/2024 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 05/07/2024 | Commercial Plumbing | PENDING ASSIGNMENT | |||
| 05/07/2024 | Fire New Construction | PENDING ASSIGNMENT | |||
| 05/07/2024 | NPPO | PENDING ASSIGNMENT | |||
| 05/07/2024 | ROW Engineering Review | PENDING ASSIGNMENT | |||
| 05/07/2024 | Site Engineering | PENDING ASSIGNMENT | |||
| 05/07/2024 | Site Landscape | PENDING ASSIGNMENT | |||
| 05/07/2024 | Site Zoning | PENDING ASSIGNMENT | |||
| 05/07/2024 | OK to Submit - Landscape Fast | REQUIRES RESUBMIT | Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview Provide a landscape plan, commercial rainwater harvesting plan, and irrigation plan that meets the standards outlined in section 7.6.4 of the Unified Development Code. Chad Keller chad.keller@tucsonaz.gov |
||
| 05/01/2024 | OK to Submit - Zoning Fast | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: KFC – Old Vail Plaza TD-DEV-1023-00428 Development Package OK to Submit (1st Review) TRANSMITTAL DATE: May 1, 2024 The development package has been reviewed by the Zoning Review Section for minimal compliance with Administrative Manual (AM) 2-06, and it has been determined that the plans do not provide sufficient information. Review AM 2-06 and provide all required notes and calculations. Also, provide the required updated Proposed Lot & Common Area Breakdown & Actual Lot & Common Area Breakdown as shown on DP14-0248 on this DP. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. |
||
| 04/25/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 05/02/2024 | OK to Submit - Engineering Fast | REVIEW COMPLETED |