Permit Number: TD-DEV-1022-00008
Parcel: 10702001D

Review Status: Approved

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - TD-DEV-1022-00008
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
09/19/2023 Commercial Plumbing APPROVED
10/16/2023 External Reviewers - PC RFCD APPROVED
08/30/2023 NPPO APPROVED
09/20/2023 ROW Engineering Review APPROVED
09/18/2023 Site Engineering APPROVED City of Tucson, Site Engineering conditionally approves these plans with the following conditions:

1. Approval is conditional on final approval by PCRFCD for any work on District Lands. A Facility Impact Permit will be required from the District prior to modification of the levee for the box culvert. This conditional approval excludes any site work including grubbing or grading activities within 150 LF of the center of the proposed 2-6x5 RCBC to be installed in the levee. This area east of “the Loop” shall be fenced and designated as “do not disturb” prior to allowance of any work including grading or importation of fill related to this Development Package. Issuance of a Facility Impact Permit for levee modification and culvert installation by PCRFCD required by 09/22/2023 or a stop work order may be issued. This will be checked and required for the Pre-construction meeting.
2. No additional development packages or construction permits will be authorized prior to completion of the installation of the RCBCs in the levee as outlined in this Development Package and approved by District.
3. A Facility Impact Permit is required prior to installation of sewer line on District Lands.
4. Update the master SWPPP to include the dust control protection on the dirt access to the southeast
10/16/2023 Site Zoning APPROVED
08/14/2023 CDRC Application Completeness REVIEW COMPLETED
10/16/2023 CDRC Post Review REVIEW COMPLETED
08/23/2023 CDRC Review Coordinator REVIEW COMPLETED Added external reviewers, sent emails and sent FYI emails per SOP.
08/23/2023 External Reviewers - Pima Association of Governments REVIEW COMPLETED Sent FYI emails per SOP.
08/23/2023 External Reviewers - Southwest Gas REVIEW COMPLETED Sent FYI emails per SOP.
08/23/2023 External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Sent FYI emails per SOP.
08/23/2023 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED Sent FYI emails per SOP.
08/30/2023 Fire New Construction REVIEW COMPLETED
08/14/2023 OK to Submit - Engineering REVIEW COMPLETED
08/14/2023 OK to Submit - Landscape REVIEW COMPLETED
08/16/2023 OK to Submit - Zoning REVIEW COMPLETED
08/30/2023 Site Landscape REVIEW COMPLETED