Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-1022-00007
Parcel: 10709049C

Address:
2445 N ORACLE RD

Review Status: Approved

Review Details: DEVELOPMENT PACKAGE REVIEW v.2

Permit Number - TD-DEV-1022-00007
Review Name: DEVELOPMENT PACKAGE REVIEW v.2
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
01/22/2024 External Reviewers - Pima County Wastewater (RWRD) APPROVED Site Construction Permit P23SC00092 Applicant Name: Theresa Hadley Site Address: Legal: MIRACLE MILE LOTS 5 & 6 BLK 4 EXC ALLEY TaxCode: 10709051A Owner Name: CITY OF TUCSON Owner Address: PO BOX 27210 TUCSON AZ Issued Date: 09/13/2023 Expiration Date: 09/13/2026 SPECIAL PERMIT CONDITIONS Please note that the validity of this permit is contingent on the following conditions: 1: Any modifications made to the right-of-way or to parcels adjacent to the development area covered by the permit post permit issuance and prior to start of construction, may require a revision to the permit should any conflicts occur. Changes in site conditions shall be validated during the required preconstruction meeting by DSD Site Group and submit for a revision to the approved plans. 2: Final Certification: Prior to request of final site inspection, a letter certifying completion in conformance with the approve plans, sealed by a registered professional engineer, architect or land surveyor shall be submitted to DSDSiteinspection@pima.gov. 3: Cultural Resources condition: In the event that human remains, including human skeletal remains, cremations, and/or ceremonial objects and funerary objects are found during excavation or construction, ground disturbing activities must cease in the immediate vicinity of the discovery. State laws ARS 41-865 and ARS 41-844, require that the Arizona State Museum be notified of the discovery at (520) 621-4795 so that cultural groups who claim cultural or religious affinity to them can make appropriate arrangements for the repatriation and reburial of the remains. The human remains will be removed from the site by a professional archaeologist pending consultation and review by the Arizona State Museum and the concerned cultural groups. 4: All revisions to approved plans must be approved by the Pima County Development Services prior to construction. Description: Public Sewer- Milago on Oracle This approval becomes null and void if work or construction does not begin within three years of issuance or if work or construction is suspended or abandoned for a period of 365 days at any time. Permit holder shall adhere to all approved construction plans/documents. Page 1 of 2Public Works Building · 201 N. Stone Ave · Tucson, AZ · 85701-1207 · (520) 724-9900 · site@pima.gov www.pima.gov NOTE: Permit & approved plans/document must be posted at job site! Call Pima County Inspection at (520) 724-6466 at least forty-eight (48) hours prior to starting work. Site inspections are scheduled within the next 5 business days. Inspection results may be verified at: permits.pima.gov For additional information on the Site Construction Permit context and requirements to proceed with site construction, please visit www.pima.gov/developmentservices. Please also consult "Inspection requirements" posted under the "Inspections & Special Inspection" section at https://www.pima.gov/1038/Building-Permits-Resources for detailed instructions, including reinspection fees, prior to scheduling an inspection. REQUIRED INSPECTION(S) 5: Easements and dedications to be recorded and submitted to Pima County prior to request for final site inspection. 6: ROW Permit Disclaimer: Any modifications made to the right-of-way or to parcels adjacent to the development area covered by the permit post permit issuance and prior to the start of construction, may require a revision to the permit should any conflicts occur. Changes in site conditions shall be validated by DOT Field Engineering during the required pre-construction inspection meeting.
01/22/2024 CDRC Application Completeness REVIEW COMPLETED
01/24/2024 CDRC Post Review REVIEW COMPLETED