Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-1022-00003
Parcel: 107031890

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW REVISION v.1

Permit Number - TD-DEV-1022-00003
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/12/2024 Commercial Plumbing APPROVED
08/06/2024 ROW Engineering Review APPROVED DTM has no comments
08/09/2024 Site Landscape APPROVED
08/09/2024 NPPO NOT REQUIRED
08/12/2024 CDRC Post Review Express PENDING ASSIGNMENT
08/07/2024 Site Engineering REQUIRES RESUBMIT 1. See zoning comments
2. The trash containers will need to be located in a trash enclosure that meets the requirements of the Technical Standards Manual section 8-01.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
08/06/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: 2420 N JACKRABBIT AV.
Development Package (1st Review – 1st Revision)
TD-DEV-1022-00003

TRANSMITTAL DATE: August 6, 2024

DUE DATE: August 8, 2024

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

1. COMMENT: 2-06.4.9.H.5 – Cleary shown how the one-way access lane shown near the southwest corner of the proposed building will be controlled.

2. COMMENT: 2-06.4.9.H.5.a - Zoning acknowledges that you are proposing to apply for an IPP. Until the IPP is approved Zoning cannot approve this DP. IPP requirements can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration#section-4.

3. COMMENT: 2-06.4.9.H.5.a - On the overall site plan the western most vehicle parking space of the 5 northern most vehicle parking spaces does not appear to be 8’-6” minimum in width. Provide a width dimension for the parking space.

4. COMMENT: 2-06.4.9.H.5.a - Keynote 29 still reference angled parking and the detail on sheet 3, but the angle parking has been removed from the plan.

5. COMMENT: 2-06.4.9.H.5.d – The short- & long-term required numbers are not correct. Review UDC Table 7.4.8-1 and provide the correct required numbers.

6. COMMENT: 2-06.4.9.R – It does not appear that the required sidewalk that goes around the southwest corner of the proposed building meets the minimum 4’ width. Provide a dimension for this sidewalk.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
07/24/2024 CDRC Application Completeness Express REVIEW COMPLETED
08/05/2024 CDRC Review Coordinator Express REVIEW COMPLETED External Reviewers not required. No further action is required from the customer at this time.
08/06/2024 Fire New Construction REVIEW COMPLETED
08/02/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
07/31/2024 OK to Submit - Zoning Fast REVIEW COMPLETED