Permit Number: TD-DEV-0926-00255
Parcel: 140420270

Address:
2650 E ELVIRA RD

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0926-00255
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/09/2026 Site Engineering Standard APPROVED
10/22/2026 Site Zoning Standard APPROVED
10/28/2026 NPPO Standard NOT REQUIRED
10/29/2026 CDRC Post Review Express PENDING ASSIGNMENT
10/29/2026 External Reviewers - Tucson Airport Authority Standard REQUIRES RESUBMIT October 28, 2026
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-0926-00255, 1
st Submittal, HEXAGON MINING PV, 2650 E. Elvira Rd, Tucson,
AZ. 85756, Received October 5, 2026
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-0926-00255, 1
st Submittal, a
development plan for new photovoltaic solar arrays within an existing parking lot of a developed
building at 2650 E Elvira Rd. This development is located in the N.W. quarter of the S.E.
quarter of Section 17, Township 15S, Range 14E, of the Gila and Salt River Meridian. The
development site occupies parcel number 140-42-0270, covers approximately 9.55 ± acres, and
is zoned as Light Industrial Zone (I-1). The nearest major roadway intersection is South Tucson
Boulevard and East Elvira Road, approximately 600 feet to the northwest of the subject
development.
This site does lie within the Tucson International Airport avigation easement requirements and
public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
According to the Federal Aviation Administration (FAA) Pre-Screening Tool, this proposed
project resulted in the following responses:
1. Based on the information you provided, you are required to file notice with the FAA. You
must submit notice at least 45 days before the start of the proposed construction or
alteration or the date an application for a construction permit is filed, whichever is
earliest.
2. Note: If you propose construction or alteration that is subject to the licensing
requirements of the Federal Communications Commission (FCC), you must submit
notice to the FAA on or before the date that an application is filed with the FCC. Visit
FCC Licensing to learn more.
The Tucson Airport Authority is requiring a resubmittal of this project. These conditions must be
included in the plan documents and shall be identified in the general notes section of all future
plans submitted to the City of Tucson for review.
Conditions of approval:
1. “The applicant shall file FAA Form 7460 with the FAA at least 45 days before
construction activities begin unless FAA staff, with the Obstruction Evaluation / Airport
Airspace Analysis (OE/AAA), provides the project applicant with written communication
that filing FAA Form 7460 is not required. It is highly recommended that the applicant
file earlier than 45 days to provide the applicant with sufficient time to respond to any
concerns which are identified by the FAA. Any cranes which are used must also be
identified with a separate Form 7460. Please file Form 7460 at
https://oeaaa.faa.gov/oeaaa/external/portal.jsp”
2. “Development of the subject property shall not cause or potentially affect aviation in the
vicinity of the site, determined in the reasonable judgment of the Tucson Airport
Authority, including but not limited to, physical obstructions to aircraft operations,
interference with operations by way of electrical static, visual obstructions through
emissions or glare, and/or the open storage of petroleum products, explosive materials,
or materials which attract or lead to the concentration of wildlife.”
Although this project does not propose a change in plan designation or zoning the Tucson
Airport Authority highly recommends the applicant add the following notes into the general notes
of the revised development plan. This project is located approximately 1,200 feet north of
Tucson International Airport and is within FAA traffic pattern airspace, an area which would be
subject to aircraft overflight and noise due to being in close proximity to Tucson International
Airport.
The proposed notes would provide a means of assuring that future owners and tenants of the
property are aware they are in proximity an airport and further assures the continued right of the
City of Tucson, Tucson Airport Authority, and all persons lawfully utilizing the Tucson
International Airport the right to utilize the airspace above or near the property. This would be
accomplished through the property owner recording the Avigation Easement and providing the
Airport Disclosure Statement to the new residents of all residential uses. The Tucson Airport
Authority believes the proposed note helps to support the City of Tucson Airport Environs
Overlay Zone and supports Plan Tucson – Land Use 26.
1. "That prior to the City's approval of the proposed development, the property owner must
record the Avigation Easement that discloses the existence and operational
characteristics of the Tucson International Airport to future owners or tenants of the
property and further conveys the right to the public to lawfully use the airspace above the
property. The Avigation Easement shall be recorded in a manner with the Pima County
recorder which shall document it as having title liability. The content of such documents
shall be according to the form and instructions provided.”
The current property owner or person authorized to sign on behalf of the current property
owner must complete, sign, and record the Avigation Easement. Please record the
Avigation Easement with the Pima County Recorder’s Office. Then send a complete
copy of the recorded easement document to Tucson Airport Authority by either email
(send to srobidoux@flytucson.com) or to the mailing address provided below.
Scott Robidoux
Manager of Planning
Tucson Airport Authority
7250 South Tucson Blvd, Suite 300
Tucson, AZ 85756”
2. Applicable to residential uses only
“The property owner/developer/applicant must provide the Airport Disclosure Statement
form, at time of sale, to the new property owners with all new unit purchases. In the
event the development of any residential uses does not involve the sale of new units but
is instead offering rental residential units to the public, the new tenant of the rental unit
must be provided a copy of the Airport Disclosure Statement form. The intent of the
Airport Disclosure Statement form is to educate and notify the new residents that they
are living near an airport. The content of such documents shall be according to the form
and instructions provided.”
The property owner (for itself or its tenants) shall forward a signed copy of the Airport
Disclosure Statement form to the Tucson Airport Authority within ten (10) days of
signature, using the Scott Robidoux mailing address provided above.
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
cc file
10/28/2026 Site Landscape Standard REQUIRES RESUBMIT PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, PLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: PV SYSTEM, PV MODULES MOUNTED ON 2 NEW STEEL CANOPIES IN AN EXISTING PAVED PARKING AREA
ACTIVITY NO: TD-DEV-0926-00255
ADDRESS: 2650 E ELVIRA RD
ZONING: LIGHT INDUSTRIAL ZONE (I-1)
10.28.2026

THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING, PER-THE-CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM).

RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. There are six mature trees that will possibly be destroyed due to the new PV system shade structures. Please provide mitigation at a one-to-one ratio for these trees and plant six new trees of the same species at 15-gallon size somewhere else on site. There are multiple areas and/or landscape planting islands that already have plants. Tap into the irrigation system at the new tree locations and provide a multi-port irrigation emitter. This single sheet site plan likely has enough space to show the six new trees on the plan view in their new location. Include a simple legend to call out the botanical and common name, size and quantity. Provide a tree planting detail that includes a root barrier for if the tree is within five feet of any hardscape. Provide a schematic tie into the existing irrigation system on the plan view and as stated above, include a detail for a multi-port irrigation emitter.

2. If an additional sheet is needed to depict this information for clarity, then I would recommend providing an additional landscape-only site plan with legend, details and notes. It is also recommended to consult with a registered landscape architect as their expertise in the preparation of compliance plans can make the approval process more seamless.

Please let me know if you have any questions.

Thank you.

CHAD KELLER, PLA
LANDSCAPE ARCHITECT

CITY OF TUCSON, PDSD, SITE REVIEW SECTION
CHAD.KELLER@TUCSONAZ.GOV
520.837.4923
09/30/2026 CDRC Application Completeness Express REVIEW COMPLETED
10/05/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added TAA, SWG, USPS, TEP to the workflow. FYI notice sent out to PAG, SWG, USPS, TEP.
10/22/2026 Commercial Plumbing Standard REVIEW COMPLETED
10/05/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
10/05/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
10/05/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
10/05/2026 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
10/26/2026 Fire New Construction Standard REVIEW COMPLETED
10/02/2026 OK to Submit - Engineering Fast REVIEW COMPLETED
10/02/2026 OK to Submit - Zoning Fast REVIEW COMPLETED
10/28/2026 ROW Engineering Review Standard REVIEW COMPLETED