Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0926-00252
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/22/2026 | ROW Engineering Review Standard | APPROVED | |||
| 10/20/2026 | NPPO Standard | NOT REQUIRED | |||
| 10/20/2026 | Site Landscape Standard | NOT REQUIRED | |||
| 10/26/2026 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 10/05/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-0926-00252 (1st Review) Project: Development plan for fence along Right of Way with Sight Visibility Triangles Location: 3760 S PARK AV Review Date: 10/5/2026 Reviewer: Marco Contreras – Engineering Associate & Joe Macaulay – Civil Engineer Reviewer Contact Information: marco.contreras@tucsonaz.gov & joe.macaulay@tucsonaz.gov Related cases: Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards. The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files. Applicable Code Links for quick/direct reference: City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593 Site Engineering Review Comments: 1. Provide the development package case number (TD-DEV-0926-00252) adjacent to the title block on each sheet of the plan set. [AM 2-06.4.1.B.6] 2. Vehicle Overhang – regarding the parking spaces shown at the SE corner of the parking lot as seen on sheet X1.3 – delineate on plan view that the 2.5’ vehicle overhang is accounted for to ensure that no conflicts with the proposed fence/gate on the perimeter. [UDC 7.4.6.H] This should be done for all spaces at the SE. This may require fence realignment to account for the overhang so that the parking space lengths are not reduced. |
||
| 10/20/2026 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL REVIEWED BY: Jeffrey Cassidy – Planner I PDSD Current Zoning Commercial Review Section PROJECT: DP for fence along ROW with Sight Visibility Triangles Development Package (1st Review) TD-DEV-0926-00252 3760 S PARK AV TUCSON, AZ 85713 I-1 ZONING TRANSMITTAL DATE: October 20, 2026 Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is September 24, 2027. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-8753 1. COMMENT: Provide the development package case number, TD-DEV-0926-00252 , adjacent to the title block on each sheet. (AM 2-06.4.1.B.6). 2. COMMENT: On the cover sheet, add general note(s) indicate that this development is subject to the Major Streets and Routes (MS&R) per UDC 5.4. (AM 2-06.4.2.F). 3. COMMENT: Illustrate or provide notes on all applicable building setback lines. (2-06.4.7.G) 4. COMMENT: If applicable, draw, label and dimension any applicable existing (Refer to Title Report) and proposed easements and provide recordation information (sequence number) (AM 2-06 4.7.I). 5. COMMENT: Per UDC 7.4.6.H.a.3, as a result of the existing shorter parking stalls, demonstrate required 30-inch overhang will not be in conflict with east property line while simultaneously meeting required 18’-0” parking stall length requirement via UDC TABLE 7.4.6-1. (AM 2-06.4.7.Q.4). 6. COMMENT: Indicate if S Park Av public or private, provide the recordation type, and fully dimensioned widths, curbs, and sidewalks. (AM 2-06.4.7.V.1). 7. COMMENT: Additional comments may be forthcoming on the next review based on responses to Zoning and other PDSD reviewer comments. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Please resubmit revised drawings and any corrected plans along with a detailed response letter, stating how all Site Zoning Review comments were addressed. **Instructions for resubmittal - www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. ***For additional information on the standards presented in this memo, please refer to the City of Tucson Administrative Manual Section 2-06 or Technical Standards noted in the comments. If you have any questions about this transmittal, please contact Jeffrey.cassidy@tucsonaz.gov |
||
| 09/24/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 09/29/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added ADOT, PAG, SWG, USPS to the workflow. FYI notice sent out to PAG, SWG, USPS. | ||
| 10/19/2026 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 10/02/2026 | External Reviewers - Arizona Department of Transportation (ADOT) Standard | REVIEW COMPLETED | ADOT has no comments. Thanks, Rick Freije |
||
| 09/29/2026 | External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | ||
| 09/29/2026 | External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | ||
| 10/26/2026 | External Reviewers - Tucson Airport Authority Standard | REVIEW COMPLETED | October 21, 2026 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0926-00252, 1st Submittal, Development plan for fence along Right of Way with Sight Visibility Triangles / 3760 S Park Av, Tucson, AZ. 85713 / Received September 29, 2026 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0926-00252, 1st Submittal, a development plan for new fence around an existing building serving industrial, office, wholesale, office, and retail uses at 3760 S Park Av. This development is located in the S.W. quarter of the S.W. quarter of Section 30, Township 14S, Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel number 132-15-003R, covers approximately 2.80 ± acres, and is zoned as Light Industrial Zone (I-1). The nearest major roadway intersection is East Ajo Way and South Park Avenue, approximately 250 feet to the southeast of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area and FAA traffic pattern airspace. The Tucson Airport Authority does not object to the first submittal of this project and is not requiring a resubmittal of this project. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520- 573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning cc file |
||
| 09/29/2026 | External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | ||
| 10/20/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 09/28/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 09/29/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED |