Permit Review Detail
Review Status: Approved
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0925-00247
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/03/2025 | Floodplain Administration Review Standard | APPROVED | |||
| 11/28/2025 | Site Engineering Standard | APPROVED | |||
| 12/01/2025 | Site Zoning Standard | APPROVED | |||
| 11/18/2025 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | 4350 E. Irvington Road Post Office Box 711, Tucson, AZ 85702 November 18, 2025 WO#T164533 City of Tucson Planning and Development Services Attn: CDRC Amin Team Dear CDRC Amin Team Subject: Julia Keen Stormwater Park TD-DEV-0925-00247 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 11/5/2025. There are existing facilities within the development which are not depicted upon the plan. POSSIBLE COPNFLICTS WITH TEP OVERHEAD LINES. PLEASE CONTACT DESIGN IF RELOCATION REQUIRED. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Martin Salazar (520) 305-6713 msalazar@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 11/19/2025 | ROW Engineering Review Standard | REVIEW COMPLETED | DTM Comments: DTM Comments addressed. Review completed |