Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0925-00239
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/15/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Provide the finished floor elevation(s) of the proposed building. Where the finished floor elevation is less than 12 inches above the elevation of the next upstream manhole in the public sewer, a backwater valve shall be installed in the building drain or branch of the building drain serving that floor. Floors discharging from above that reference point shall not discharge through the backwater valve. Reference: Section 714.1, IPC 2018, as amended by the City of Tucson. | ||
| 10/13/2025 | Design Review Standard | REQUIRES RESUBMIT | Applicant has indicate the SMD overlay will be used for this project. An SMD Design Package will need to be submitted as a subrecord of this Development Package, with required materials for SMD, historic preservation and IPP review, as indicated in the Special Applications instructions (https://www.tucsonaz.gov/files/sharedassets/public/v/3/pdsd/documents/submission-documents/special_…). Thanks. | ||
| 10/30/2025 | External Reviewers - Tucson Electric Power (TEP) Standard | REQUIRES RESUBMIT | 4350 E. Irvington Road Post Office Box 711, Tucson, AZ 85702 October 28, 2025 WO#T164329 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Ascent - Tucson TD-DEV-0925-00239 Tucson Electric Power Company (TEP) has reviewed and cannot approve the development plan submitted 9/24/2025. There are no existing facilities within the development.COMMENTS ONLY PLEASE INDICATE APPROVAL WITH THE BELOW CHECK BOX PLEASE DO NOT ADJUST IF THERE ARE NO COMMENTS Further: Development plans do not show TEP poles & lines or Public Alleyway Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Martin Salazar (520) 305-6713 msalazar@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 10/14/2025 | Fire New Construction Standard | REQUIRES RESUBMIT | -Provide a dedicated sheet for fire aerial apparatus access only. Show the proposed location(s). Shall meet all the requirements of 2024 IFC Section D105. Needs to meet the width and proximity to building with no overhead obstructions (including landscaping). -Show the location of the fire department connections to verify they are within the required 100' of a fire hydrant per IFC 507.5.1.1 john.vincent@tucsonaz.gov 5203495581 |
||
| 10/21/2025 | NPPO Standard | REQUIRES RESUBMIT | Please see Site Landscape Comments for NPPO requirements. Thank you. Chad Keller, RLA chad.keller@tucsonaz.gov 520.837.4923 |
||
| 10/13/2025 | ROW Engineering Review Standard | REQUIRES RESUBMIT | Upload of Traffic Impact analysis required to continue accurate and effective review.. | ||
| 10/16/2025 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TD-DEV-0925-00239 Location: 136 N PARK AV Review Date: 10/16/2025 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering Comments: 1. Provide the development package activity number TD-DEV-0925-00239 on the plans title block. 2. On sheet 6 within the northeast corner of the parking garage, next to the utility room, show compliance with the required Back-up spur requirements. UDC 7.4.6.F.4. 3. Provide a detail displaying trash truck maneuverability for the trash enclosure in compliance with Technical Standards Manual 8-01.5.3 4. Provide a descriptor box adjacent to each basin (Includes Stormwater Harvesting basins/landscaping). Include a leader arrow to the basin or provide a label for the basin and reference the label on the top of the descriptor box. Include the following applicable information in the descriptor box: a. Total volume, cubic feet or acre feet; b. If applicable, detention volume, cubic feet or acre feet; c. If applicable, retention volume, cubic feet; d. If applicable, first-flush retention volume, cubic feet; e. If applicable, Q100 in, cubic feet per second; f. If applicable, Q100 out, cubic feet per second; g. Basin top elevation, feet; h. 100-year water surface elevation, feet; and i. 100-year ponding depth, (measured from the lowest elevation of the basin), feet. DSSDR 11.1.3 5. Include all dimensions and Detail of the storage/trash/recycle room and equipment and identify pathway to the service pick-up area. 6. Drainage statement insufficient. Provide the appropriate hydraulic calculation sheets used for the design and use of the drainage improvements proposed, such as the drains, catch basins, and scupper types. It is also required that hydrological data sheets for calculating the 2-, 10-, and 100-year peak discharges for storm events are provided to show that Pre-Development and Post-Development charts be provide for analysis that Balanced Basin requirements are achieved for attenuating the 2-, 10-, and 100-year peak discharges. Although first flush is not required due to the decrease in impervious coverage, provide analysis on the achieved first flush with the landscaping areas. Drainage Manual 2.13 If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 10/21/2025 | Site Landscape Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: MULTI-FAMILY DEVELOPMENT, 5-STORY, 366,520 SF, 235 UNITS, 800 BEDS ACTIVITY NO: TD-DEV-0925-00239 ADDRESS: 136 N PARK AV ZONING: C-1 COMMERCIAL ZONE; R-2 RESIDENCE ZONE; URBAN OVERLAY DISTRICT-UOD (SUNSHINE MILE) LAND USE: MULTIFAMILY 10.21.2025 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape and NPPO Section review comments have been addressed. SITE LANDSCAPE/NPPO SECTION COMMENTS: 1. The ROW and the utility corridor include many landscape elements. Transportation landscape review has been added to this review cycle. Reach out to David Marhefka (david.marhefka@tucsonaz.gov) for approval of all landscape work being done in the ROW. Include your coordination with David, and DTM as a letter or email PDF with your next submittal. 2. Referencing between the planting and civil utility plans there doesn’t appear to be any conflicts. Please coordinate all plantings and other landscape elements with the utilities shown on the civil plans. It is understandable if you chose not to show the utility lines on the planting plan, but if the underground utilities (water lines) at the south end (and any other applicable area on site) could be shown as a really light gray, that would be helpful for review and for clarity in the field. 3. It is recognized and appreciated that a Commercial Rainwater Harvesting plan and calculations is being included with this project submittal. The 3% shown on the plant water demand spreadsheet is rainfall within each WHIA only. Can a disclaimer note be added near the plant water demand spreadsheet that explains your efforts of depressing all planting areas, also state the exemption due to the Sunshine Mile District overlay and that the water harvest infiltration areas are only catching what falls within the planters? Drainage Side Note: The design intention appears to include the roof drainage overflowing from the downspout/splash pad foundation planting areas to adjacent planting areas. A scupper from the foundation planting area flush with the sidewalk may be a better alternative than letting the water flow over the sidewalk. Coordinate with your team and consider this option. 4. The cross-sections are a great addition to the plans. Will all landscape planting areas be depressed slightly for rainwater harvest. If so, please include a note that they will be depressed a few inches to catch additional rainwater. If the cross-section details can show this slight depression, that would be helpful as well. 5. The cross-section on sheet L5.07 includes a RWH curb cut. Can a note also be added to scupper flush or under the sidewalk for drainage in and out of the planters on both sides of the sidewalk? If this is not the intent, then disregard my comment. 6. The shade calculation in the matrix is great. Can the required open space calculation be added to the matrix for abundant design requirement clarity? Summarize any other Sunshine Mile District requirements applicable to this project for additional clarity during review. 7. Design Review Board approval is required prior to PDSD Site Landscape approval. 8. The mitigation summary and mitigation calculations call out (1) Barrel to be transplanted. It is not shown on the planting plan or planting schedule. 9. The planting plan indicates a cultivar ‘Burgundy’ Desert Willow. Is that what is on site or is it the standard protected Desert Willow from TSM 5-03.2.0 Protected Native Plant List? 10. Can a simple summary of TOS and Mitigation plants be added to the NPPO and the planting plan sheets. This is a simple NPPO plan, but this quick addition really helps the inspectors if I’m not available to be on site. 11. Provide the development package case number, TD-DEV-0925-00239, adjacent to the title block on all site landscape sheets, per Administrative Manual 2-06.4.3 12. Prior to Site Landscape Development Package approval, please make sure Site Zoning and Site Engineering comments are addressed. Thank you. Chad Keller, RLA Landscape Architect chad.keller@tucsonaz.gov 520.837.4923 |
||
| 10/23/2025 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Fernando Garcia PDSD Zoning Review Section PROJECT: Development Package 136 N Park Av, Tucson, AZ 85719 TD-DEV-0925-00239 TRANSMITTAL DATE: October 23, 2025 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is September 18, 2026. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) CONTENT REQUIREMENTS 2-06.4.2.C - The number of proposed lots and common areas are to be noted. If the subdivision is a Flexible Lot Development (FLD), a condominium, or a similar type of residential subdivision utilizing special provisions of the UDC, it shall be so noted; 1. COMMENT: 2-06.4.2.C – Per the Pima County Assessor Parcel Map, part of the site currently appears to be a portion of an alley owned by the City of Tucson. Clarify status of this real property. See Pima County Assessor Parcel Map at https://www.asr.pima.gov/ParcelData/Map/Arm/MP01/01004_06.pdf. 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 2. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-0925-00239, adjacent to the title block on each sheet. Please also list the Special Districts activity number, when assigned, as well as C9-20-11, which ordinance the Sunshine Mile Urban Overlay District for the subject parcels. 2-06.4.7.A.5 - On residential projects, list the total number of units/lots proposed. 3. COMMENT: 2-06.4.7.A.5 – In the “Development Standards” table on Sheet 1, the “Required/Allowed” Maximum Density is stated as “None”. This is incorrect. Per the Sunshine Mile District Overlay, in the Park Subarea (Section IV.3), the maximum residential density permitted is 64 RAC. 2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan. 4. COMMENT: 2-06.4.7.A.6 – Include a note listing the ten “Environmentally Conscious Design Practices” approved for this project as part of the Sunshine Mile District Overlay per Section III.M. 2-06.4.8.B - All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided. 5. COMMENT: 2-06.4.8.B – The sequence number provided for a described “Exist 5’ R/W Easement SEQ #20193250266 to be abandoned” on sheet 2 does not appear to describe the annotated easement and instead describes the adjacent electric easement provided to TEP. Please clarify the 5’ easement. 2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC. 6. COMMENT: 2-06.4.9.H.5.a – Parking calculations table is titled “Welcome Broadway”; please correct title. Provide a note that the parking calculations table is per the Sunshine Mile UOD, Table III.H.1 (for motor vehicles), Section III.H.5. (for bicycles), rather than underlying zoning. Clarify number of motor vehicle parking spaces proposed within the right-of-way along adjacent residential streets. Per the Sunshine Mile UOD, Section III.H.4, parking structures “shall install one electric vehicle charging space for every 100 vehicular parking spaces provided”. Provide a separate electric vehicle supply equipment (EVSE) calculation as part of the parking calculations table and annotate designated spaces on the plans. 2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided. 7. COMMENT: 2-06.4.9.H.5.d – Per UDC 7.4.9.C.2., short-term bicycle parking must be located within 50 feet of each public entrance to a building and located outside the building. The provided plans do not demonstrate compliance with this requirement. 2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s). 8. COMMENT: 2-06.4.9.Q – Sheets 1 and 2 indicated a height of 70 8” MAX to top of parapet of the building(s) and 68’ 2” to top of parapet of the parking garage, but the Development Standards table on Sheet 1 states that the proposed building height to be “59.67’ MAX T.O.P.” Clarify inconsistencies between the table and the plan sheets. ***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations If you have any questions about this transmittal, contact Site Zoning Reviewer Fernando Garcia at fernando.garcia2@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf. |
||
| 10/22/2025 | Transportation Landscape Review Standard | REQUIRES RESUBMIT | See notes/comments on plans. | ||
| 09/18/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 09/24/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | EXTERNAL REVIEWERS CDRC added, TAA, TEP, ADOT, ADDRESSING, HIST, SWG USPS, and PAG to the workflow. Review request email sent to TAA, TEP, ADOT, ADDRESSING,, FYI email sent to, SWG USPS PAG. |
||
| 10/23/2025 | External Reviewers - Arizona Department of Transportation (ADOT) Standard | REVIEW COMPLETED | Good Afternoon, ADOT has no comments on this DEV. Thank you for the opportunity to review |
||
| 09/24/2025 | External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | FYI CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. |
||
| 10/17/2025 | External Reviewers - Pima County Addressing Standard | REVIEW COMPLETED | Good afternoon, Pima County Addressing approves of TD-DEV-0925-00239. David Wilging Planner I - Addressing Division Pima County Development Services 201 N. Stone Avenue 1st Floor Tucson, Arizona 85701 520-724-6381 |
||
| 09/24/2025 | External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | FYI CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. |
||
| 10/06/2025 | External Reviewers - Tucson Airport Authority Standard | REVIEW COMPLETED | October 3, 2025 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0925-00239, 1st Submittal, Multi-Family Development, 5-Story, 366,520 SF, 235 Units, 800 Beds. / 136 N. Park Ave, Tucson, AZ. 85719, Received September 24, 2025 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0925-00239, 1st Submittal, a development plan for a new multi-family development at 136 North Park Avenue. This development is located in the N.E. quarter of the S.W. quarter of Section 7, Township 14S, Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel numbers 124-06-1720, 124-06-0171B, 124-06-152A, 124-06-1530, 124-06-154B, 124-06-157A, 124-06- 158A, and 124-06-159B, covers approximately 3.636 ± acres, is zoned as Commercial 1 Zone (C-1), Commercial 2 Zone (C-2), Residence 2 Zone (R-2), is located within the Urban Overlay District, and is located within the Sunshine Mile District. The nearest major roadway intersection is East 10th Street and North Park Avenue, approximately 50 feet to the southwest of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the 1st submittal of this project and is not required a resubmittal of this project. Although this project does not propose a change in plan designation or zoning the Tucson Airport Authority highly recommends the applicant add the following notes into the general notes of the revised development plan. This project is located approximately 6.16 miles north of Tucson International Airport and is within FAA traffic pattern airspace, an area which would be subject to aircraft overflight and noise due to being in close proximity to Tucson International Airport. The proposed notes would provide a means of assuring that future owners and tenants of the property are aware they are in proximity an airport and further assures the continued right of the City of Tucson, Tucson Airport Authority, and all persons lawfully utilizing the Tucson International Airport the right to utilize the airspace above or near the property. This would be accomplished through the property owner recording the Avigation Easement and providing the Airport Disclosure Statement to the new residents of all residential uses. The Tucson Airport Authority believes the proposed note helps to support the City of Tucson Airport Environs Overlay Zone and supports Plan Tucson – Regional and Global Positioning policy 4 (RG-4). 1. "That prior to the City's approval of the proposed development, the property owner must record the Avigation Easement that discloses the existence and operational characteristics of the Tucson International Airport to future owners or tenants of the property and further conveys the right to the public to lawfully use the airspace above the property. The Avigation Easement shall be recorded in a manner with the Pima County recorder which shall document it as having title liability. The content of such documents shall be according to the form and instructions provided.” The current property owner or person authorized to sign on behalf of the current property owner must complete, sign, and record the Avigation Easement. Please record the Avigation Easement with the Pima County Recorder’s Office. Then send a complete copy of the recorded easement document to Tucson Airport Authority by either email (send to srobidoux@flytucson.com) or to the mailing address provided below. Scott Robidoux Manager of Planning Tucson Airport Authority 7250 South Tucson Blvd, Suite 300 Tucson, AZ 85756” 2. Applicable to residential uses only “The property owner/developer/applicant must provide the Airport Disclosure Statement form, at time of sale, to the new property owners with all new unit purchases. In the event the development of any residential uses does not involve the sale of new units but is instead offering rental residential units to the public, the new tenant of the rental unit must be provided a copy of the Airport Disclosure Statement form. The intent of the Airport Disclosure Statement form is to educate and notify the new residents that they are living near an airport. The content of such documents shall be according to the form and instructions provided.” The property owner (for itself or its tenants) shall forward a signed copy of the Airport Disclosure Statement form to the Tucson Airport Authority within ten (10) days of signature, using the Scott Robidoux mailing address provided above. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520- 573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning cc file |
||
| 09/24/2025 | External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | FYI CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. |
||
| 10/08/2025 | Historic | REVIEW COMPLETED | |||
| 09/19/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 09/19/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED | As this project proposed to utilize the Sunshine Mile Urban Overlay District, a Special Districts application must first be separately applied for and approved before this development package can be fully approved. No current record of a Special Districts application was found as of this date, Sep. 19, 2025. |