Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-0924-00266
Parcel: 12105012H

Address:
5502 E GRANT RD

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0924-00266
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/13/2024 NPPO APPROVED
11/14/2024 CDRC Post Review Express PENDING ASSIGNMENT
11/04/2024 Commercial Plumbing REQUIRES RESUBMIT Private sewers 8-inches and larger require manholes, not cleanouts. Reference: Section 708.1.2, IPC 2018.
11/14/2024 External Reviewers - Tucson Electric Power (TEP) REQUIRES RESUBMIT November 13, 2024
WO#T131331
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Circle K - Grant and Craycroft
TD-DEV-0924-00266
Tucson Electric Power Company (TEP) has reviewed and cannot approve the
development plan submitted 10/3/2024. There are existing facilities within the
development which are depicted upon the plan; however, Transformer AB-4 also serves
2300 N Craycroft, cannot be relocated due to disinterested 3rd party.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Jesus 'Chuy' Figueroa
(520) 262-9400
jfigueroa@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
11/04/2024 Site Engineering REQUIRES RESUBMIT 1. The waste enclosure does not meet the minimum requirements for clear space (10'-4" depth) and apron slope (2%) per TSM 8. Please revise.
2. The SWPPP does not show any erosion control around the perimeter of the site. Please clearly show erosion control (i.e. sediment wattle) around the entire perimeter of the site.
3. The drainage statement has incorrect numbers in Tables 1 and 2. Based on the worksheet calculations, Tables 1 and 2 show Q50 instead of Q100 for Pre-Dev and Existing Dev. The Q100 values should be 11.2cfs and 15.2cfs, respectively. The Proposed Dev and Pre-Water Harvesting values for Q10 should be 6.8cfs. Please revise.

Mike Ortiz
michael.ortiz@tucsonaz.gov
11/13/2024 Site Landscape REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
PDSD SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: RAISE AND REBUILD OF EXISTING BANK FOR NEW CIRCLE K FUELING CANOPY AND CONVENIENCE STORE
ACTIVITY NO: TD-DEV-0924-00266
ADDRESS: 5502 E GRANT RD
ZONING: C-1 COMMERCIAL ZONE

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Clearly label all property lines as well as existing and future ROWs if applicable on all plan sheets in the landscape set.

2. Provide an irrigation sleeve across all sidewalks.

3. Providing the gallons per hour for shrubs is great. For consistency add the gallons per hour to trees to note number 4 on the irrigation plan.

4. Update the Tree Calculations for Parking table to read 5 trees provided.

5. Provide a multi-trunk tree detail with no stakes and callout to remove the nursery stake.

6. Tree staking notes are included in the tree planting detail. Should a time period advisement for removal of tree stakes for contractor/owner clarity be added to the detail and the general landscape or maintenance notes? This is something I’ve been noticing out on finished project sites. The staking cinch-ties have been constricting and damaging newly planted trees due to never being removed as the tree is maturing.

7. Ensure that Zoning and Engineering comments are addressed prior to landscape section approval.

8. Provide the development package case number, TD-DEV-0924-00266, adjacent to the title block on all sheets. 2-06.4.3


If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov or at 520.837.4923
11/13/2024 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO:
Development Services Department
Plans Coordination Office

FROM:
Fernando L. García
PDSD Zoning Review Section

PROJECT:
TD-DEV-0924-00266
5502 E Grant Rd., Tucson, AZ 85712
Development Package (1st Review)

TRANSMITTAL DATE: November 13, 2024
DUE DATE: October 31, 2024

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Alert the reviewer below by email directly on resubmittal for faster processing.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is September 26, 2025.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE


2-06.4.9.A - Draw in all proposed lot lines with approximate distances and measurements.

1. COMMENT: 2-06.4.9.A – This site is composed of two separate parcels. A lot combination is required prior to final approval of this permit. The site plan indicates that a lot combination has been requested through Pima County. Please provide proof of this request. A receipt for payment of the lot combination permit can be used.


2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual.

2. COMMENT: 2-06.4.9.R – Per UDC TSM Section 7-01.3.3., pedestrian circulation from the building to all adjoining streets is required. None is shown to E Grant Rd. If the applicant desire to request relief from this requirement, a Technical Standards Modification Request, will be required to be submitted and approved before this development package can be approved by Site Zoning. For more information, or to obtain a copy of the application form, please contact Stephen Blood, Section Manager for Site Engineering at Stephen.blood@tucsonaz.gov or at 520-837-4958.



***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations

If you have any questions about this transmittal, Contact Fernando García by email fernando.garcia2@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter; TSMR application if required. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
09/25/2024 CDRC Application Completeness Express REVIEW COMPLETED
10/03/2024 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added TEP PAG, USPS, SWG to the workflow. Review request email sent to TEP. FYI email sent to PAG, USPS, SWG.
10/03/2024 External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
10/03/2024 External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
10/03/2024 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
10/17/2024 Fire New Construction REVIEW COMPLETED
10/01/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
10/02/2024 OK to Submit - Zoning Fast REVIEW COMPLETED
10/21/2024 ROW Engineering Review REVIEW COMPLETED TD-DEV-0924-00266 • 5502 E GRANT RD

1. Per Sec. 6.3.2 of the Transportation Access Management Guidelines for the City of Tucson, a Traffic Impact analysis will be required for this development.

If you have any questions, please contact Richard Leigh at 520-403-0970 or email richard.leigh@tucsonaz.gov.