Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-0924-00266
Parcel: 12105012H

Address:
5502 E GRANT RD

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0924-00266
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/08/2025 External Reviewers - COT Environmental Services APPROVED
01/02/2025 Site Engineering APPROVED
01/03/2025 Site Landscape APPROVED Site Landscape/NPPO Review Section Comments:

1. Detail number 8 on sheet L-4 calls out Oro Valley to review detail if revisions are made. Update to say City of Tucson.

Thank you.
Chad Keller, PLA
chad.keller@tucsonaz.gov
01/08/2025 CDRC Post Review Express PENDING ASSIGNMENT
01/08/2025 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO:
Development Services Department
Plans Coordination Office

FROM:
Fernando L. García
PDSD Zoning Review Section

PROJECT:
TD-DEV-0924-00266
5502 E Grant Rd., Tucson, AZ 85712
Development Package (2nd Review)

TRANSMITTAL DATE: January 8, 2025


COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Alert the reviewer below by email directly on resubmittal for faster processing.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is September 26, 2025.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE


2-06.4.9.A - Draw in all proposed lot lines with approximate distances and measurements.

1. COMMENT: 2-06.4.9.A – This site is composed of two separate parcels. A lot combination is required prior to final approval of this permit. The site plan indicates that a lot combination has been requested through Pima County. Please provide proof of this request. A receipt for payment of the lot combination permit can be used.


2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual.

2. COMMENT: 2-06.4.9.R – Site Zoning acknowledges that a TSMR has been submitted to request relief from the requirement for pedestrian circulation from the building to all adjoining streets. Final Site Zoning approval of this permit cannot be granted until the TSMR is processed.



***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations

If you have any questions about this transmittal, Contact Fernando García by email fernando.garcia2@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approved TSMR. Updated comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
12/04/2024 CDRC Application Completeness Express REVIEW COMPLETED
12/31/2024 Commercial Plumbing REVIEW COMPLETED Execute the following:
1. Apply for the WUF (Wastewater User Fee connection permit).
2. Is greywater irrigation available.
3. Determine water meter size required in turn determines the sewer connection fee.
4. Confirm sewer and water capacity availability.
5. Is back water valve required.
6. Ensure oil/sand separator is sized correctly, installed prior to entering sewer system.
12/12/2024 External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Greetings,



Tucson Electric Power Company (TEP) has conducted a thorough review of development plan TD-DEV-0924-00266 and wishes to convey that there are no objections to the proposed plan. It is important to note that any costs associated with removing or relocating existing TEP facilities will be billed to the developer. There are currently TEP facilities within the boundaries of the proposed plat.



To initiate service for the new development, please get in touch with the New Construction Department at 520-918-8300. You are required to submit a final set of approved plans, which should include details regarding electrical load and offsite improvement plans. This information is essential for TEP to determine the most efficient way to serve your development. Should easements be necessary for any new TEP facilities, they will be acquired through a separate instrument.



Thank you for taking the time to look into these matters. We look forward to collaborating with you on this project.





Respectfully,

Tucson Electric Power Co.

Land Resources Department
01/03/2025 TSMR/PDMR - Engineering REVIEW COMPLETED 1. ES approval required for Trash Enclosure modifications
01/08/2025 TSMR/PDMR - Zoning REVIEW COMPLETED