Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0923-00410
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/02/2023 | Commercial Plumbing | APPROVED | |||
| 11/12/2023 | NPPO | APPROVED | |||
| 11/17/2023 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 11/17/2023 | ROW Engineering Review | REQUIRES RESUBMIT | TD-DEV-0923-00410 (3544 E FORT LOWELL RD TUCSON, AZ 85716) Please resubmit revised drawings along with a detailed response letter which states how all comments were addressed. Comments: 1. TSM 10-01.4.1 - It appears the eastern most driveway on Ft. Lowell is out of compliance and will need to be reconstructed. Please either show that the current sidewalk where it is crossed by the driveway has a cross slope that smaller than 2% or show a plan to rebuild the driveway with a level sidewalk. Please include a callout on the site plan reference P. A. G. SD 206 for a new driveway apron. You can also see SDG 3-15 for design alternatives. Faffs Riederer Faffs.Riederer@tucsonaz.gov Abbreviations: City of Tucson Code (COTC), Unified Development Code (UDC) Administrative Manual (AM), Technical Standards Manual (TSM), Street Design Guide (SDG), Pima Association of Governments Standard Details (P. A. G. SD), Access Management Guidelines (AMG), Major Streets and Routes Plan (MS&R). |
||
| 11/09/2023 | Site Engineering | REQUIRES RESUBMIT | Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview The Design Standards for Stormwater Detention and Retention manual can be found online at https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf TD-DEV-0923-00410 1. The waste stream calculations indicate that the waste will be collected in two 6 cubic yard waste bins and two 2 cubic yard recycling bins. The site plans show two dumpster enclosures, which only have capacity for one 6 cubic yard dumpster each. Show the enclosure for the recycling bins on the plan or revise the proposed dumpster enclosure to include space for the recycling bins. Lianne Evans lianne.evans@tucsonaz.gov |
||
| 11/16/2023 | Site Landscape | REQUIRES RESUBMIT | ACTIVITY NO. TD-DEV-0923-00410 PROJECT: AGM CONTAINER CONTROLS ADDRESS/PARCEL: 3544 E FORT LOWELL RD ZONING: P-1 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed. COMMENTS: 1. Ensure that Zoning, Engineering comments, and concerns are addressed prior to landscape section approval. 2. Please include the correct Development Package number, TD-DEV-0923-00410 on all landscape & NPPO sheets. Also include it on the ERR submitted with this development package. 3. Label sight visibility triangles and ROW’s (current and future) on all landscape, irrigation, and commercial rainwater harvesting plans. 4. Ensure the Grading Plan matches the Commercial Rainwater Harvesting Plan & the Landscape Plan. 5. If using d.g at a 2” depth, ensure the rainwater harvesting basins are 8” in depth to account for the d.g. Then revise the Site Water Budget table to reflect these changes. If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988 |
||
| 10/30/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: AGM Container Controls Development Package (1st Review) TD-DEV-0923-00410 TRANSMITTAL DATE: October 30, 2023 DUE DATE: November 11, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is October 10, 2024. 2-06.4.0 CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0923-00410, adjacent to the title block on all sheets. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 2. COMMENT: 2-06.4.7.A.3 – Provide rezoning case numbers, C9-85-79 & C9-05-01, adjacent to the title block on all sheets. And provide the conditions of rezoning on the plan. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 3. COMMENT: 2-06.4.9.H.5.c – The loading space calculation is not correct. The 2 type B loading spaces meet the requirements for the general manufacturing, but the commercial storage requires 1 type A. 4. COMMENT: 2-06.4.9.H.5.d – The required ratio for the long-term bicycle parking for the Admin/Office is not correct. Remove the reference to “10 MAX.” as it is not applicable. 5. COMMENT: 2-06.4.9.O – The required perimeter yard setback to the “WEST” does not address the R-2 Zoned properties to the west. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter. |
||
| 10/04/2023 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 10/18/2023 | CDRC Review Coordinator Express | REVIEW COMPLETED | No external reviewers, nor added. | ||
| 10/27/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 10/11/2023 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 10/04/2023 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
| 10/04/2023 | OK to Submit - Zoning Fast | REVIEW COMPLETED |