Review Date Reviewer's Name Type of Review Description Status Comments
10/18/2023 Commercial Plumbing APPROVED
10/18/2023 External Reviewers - Tucson Airport Authority APPROVED October 17, 2023
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-0923-00392, Santa Cruz Lighting Development Plan / 2975 S Santa Cruz Ln, Tucson, AZ 85713, Received September 21, 2023
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-0923-00392, the development plan for installing new lights at 2975 S Santa Cruz Ln. This development is located in the N.W. quarter of the N.E. quarter of Section 26, Township 14S, Range 13E, of the Gila and Salt River Meridian. The development site occupies parcel number 119-18-002E, covers approximately 5.3 ± acres, and is zoned as Residence Zone 1 (R-1). The nearest major roadway intersection is West 34th Street and South Santa Cruz Lane, approximately 0.25 miles to the northwest of the subject development.
This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
The Tucson Airport Authority approves the proposed project and is not requiring a resubmittal.
Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
10/11/2023 ROW Engineering Review APPROVED
10/18/2023 Site Engineering APPROVED
10/16/2023 NPPO NOT REQUIRED
10/18/2023 CDRC Post Review Express PENDING ASSIGNMENT
10/11/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Santa Cruz Lighting
Development Package (1st Review)
TD-DEV-0923-00392

TRANSMITTAL DATE: October 11, 2023

DUE DATE: October 18, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is September 19, 2024.

2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS

1. COMMENT: 2-06.2.4 – For your information sheet 4 will not be reviewed for code compliance during the development package review. A separate permit is required.

CONTENT REQUIREMENTS

2. COMMENT: 2-06.4.1 – Provide a phone number of the owner listed on sheet 1.

3. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0923-00392 & special exception case number, TP-ENT-0923-00037, adjacent to the title block on all sheets.

4. COMMENT: 2-06.4.4 - The project-location map shall be drawn at a minimum scale of three inch equals one mile.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

5. COMMENT: 2-06.4.7.A.2 - List the gross area of the site by square footage and acreage.

6. COMMENT: 2-06.4.7.A.6.a - As a general note provide the special exception case number, date of approval, what was approved, and the conditions of approval, if any.

Additional Comments:

7. COMMENT: The proposed does not meet the requirements of UDC Article 4.9.11.A.9 the use shall be located wholly within an enclosed building or within an area enclosed on all sides with a masonry wall or compact evergreen hedge, not less than six feet, nor more than ten feet, in height.

8. COMMENT: Until the special exception is approved Zoning cannot approve the DP.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter.
09/11/2023 CDRC Application Completeness Express REVIEW COMPLETED
09/21/2023 CDRC Review Coordinator Express REVIEW COMPLETED Review request email sent per ADOT & TAA, FYI email sent per SOP.
10/13/2023 External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED EXTERNAL] Re: DUE OCT 18TH, 2023 / SANTA CRUZ LIGHTING DEVELOPMENT PLAN / TD-DEV-0923-00392

Jay Gomes
CDRC
Good Morning,

ADOT has no comments on this DEV.

Thank you for the opportunity to review.
09/21/2023 External Reviewers - Pima Association of Governments REVIEW COMPLETED FYI email sent per SOP.
09/21/2023 External Reviewers - Southwest Gas REVIEW COMPLETED FYI email sent per SOP.
09/21/2023 External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED FYI email sent per SOP.
09/21/2023 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED FYI email sent per SOP.
09/28/2023 Fire New Construction REVIEW COMPLETED
09/13/2023 OK to Submit - Engineering Fast REVIEW COMPLETED
09/20/2023 OK to Submit - Landscape Fast REVIEW COMPLETED
09/18/2023 OK to Submit - Zoning Fast REVIEW COMPLETED
10/16/2023 Site Landscape REVIEW COMPLETED