Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0826-00226
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/05/2026 | NPPO Standard | NOT REQUIRED | |||
| 10/05/2026 | Site Landscape Standard | NOT REQUIRED | |||
| 10/09/2026 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 09/28/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-0826-00226 (1st Review) Project: New Shipping Container Location: 3155 E SPEEDWAY BL Review Date: 9/28/2026 Reviewer: Joe Macaulay – Civil Engineer – Site Development Reviewer Contact Information: joe.macaulay@tucsonaz.gov Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards. The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files. Applicable Code Links for quick/direct reference: City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593 Site Engineering Review Comments: 1. Provide the development package case number, TD-DEV-0826-00226, adjacent to the title block on all sheets. |
||
| 10/08/2026 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL REVIEWED BY: Jeffrey Cassidy – Planner I PDSD Current Zoning Commercial Review Section PROJECT: CIRCLE K FOR A NEW SHIPPING CONTAINER Development Package (1st Review) TD-DEV-0826-00226 3155 E SPEEDWAY BL TUCSON, AZ 85716 C-2 ZONING TRANSMITTAL DATE: October 08, 2026 Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is August 18, 2027. 1. COMMENT: Provide the development package case number, TD-DEV-0826-00226, adjacent to the title block on each sheet. (AM 2-06.4.1.B.6). 2. COMMENT: The square footage of the existing store and proposed shipping container is approximately 2,460 square feet. With the Retail – General Merchandise Sales Use at 1 vehicular parking stall per 300 square feet of gross floor area, the total required spaces is rounded down to 8 spaces. Remove the proposed location that is currently shown as a tandem layout (closest to E Speedway Bl) and update parking table. (AM 2-06.4.2.J). 3. COMMENT: Illustrate or provide notes on setbacks lines along E Speedway Bl (10’-0”) and N Camilla Bl (20’-0”). (2-06.4.7.G) (UDC 6.4.5.C.2.a and b.) 4. COMMENT: Update parking stall widths for proposed one parking stall and stall adjacent to ADA stall to 8’-6” wide graphically and with dimensions. (AM 2-06.4.7.Q.4). (UDC Table 7.4.6-1). 5. COMMENT: Additional comments may be forthcoming on the next review based on responses to Zoning and other PDSD reviewer comments. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Please resubmit revised drawings and any corrected plans along with a detailed response letter, stating how all Site Zoning Review comments were addressed. **Instructions for resubmittal - www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. ***For additional information on the standards presented in this memo, please refer to the City of Tucson Administrative Manual Section 2-06 or Technical Standards noted in the comments. If you have any questions about this transmittal, please contact Jeffrey.cassidy@tucsonaz.gov |
||
| 09/17/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | External Reviewers not required. No further action is required from the customer at this time. | ||
| 10/08/2026 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 10/08/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 09/16/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 10/09/2026 | ROW Engineering Review Standard | REVIEW COMPLETED | No impact to ROW |