Permit Review Detail
Review Status: In Review
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0826-00218
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/01/2026 | NPPO Standard | NOT REQUIRED | |||
| 09/01/2026 | Site Landscape Standard | NOT REQUIRED | |||
| N/A | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| N/A | External Reviewers - Tucson Electric Power (TEP) Standard | PENDING ASSIGNMENT | |||
| N/A | ROW Engineering Review Standard | PENDING ASSIGNMENT | |||
| N/A | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 09/01/2026 | Fire New Construction Standard | REQUIRES RESUBMIT | -Show the location of the fire dept. connections on the drawings. Verify the FDC is not inside the fenced area or obstructed by the shipping containers. john.vincent@tucsonaz.gov 5203495581 |
||
| 08/31/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-0826-00218 (1st Review) Project: Shipping Containers and Chain Link Fence Location: 9495 E SPEEDWAY BL Review Date: 8/31/2026 Reviewer: Joe Macaulay – Civil Engineer – Site Development Reviewer Contact Information: joe.macaulay@tucsonaz.gov Related cases: TC-FBB-0526-00060 Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards. The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files. Applicable Code Links for quick/direct reference: City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593 Site Engineering Review Comments: 1. Provide the development package case number, TD-DEV-0826-00218, adjacent to the title block on all sheets. 2. Please revise sheet count at the bottom right corner to show correct total sheet number (Sheet 1 of 2 & Sheet 2 of 2). 3. Access lanes and PAALs must be setback at least 2 feet from a wall, screen, or other obstruction over 6-inches. [UDC 7.4.6.F.2.b.] a. Please revise layout to provide the required 2-foot setback in addition to the required 24-foot 2-way PAAL width. [UDC 7.4.6-2] 4. Permit TC-FBB-0526-00060 site plan must match what is proposed on the Development Package (TD-DEV-0826-00218). 5. Site Engineering will be unable to approve permit TC-FBB-0526-00060 until the associated Development Package (DP) permit is approved. |
||
| 08/06/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 08/13/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added TEP to the workflow. FYI notice sent out to TEP. | ||
| 08/06/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 08/10/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED |