Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0826-00217
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/18/2026 | Site Engineering Standard | APPROVED | |||
| 09/01/2026 | NPPO Standard | NOT REQUIRED | |||
| 09/01/2026 | Site Landscape Standard | NOT REQUIRED | |||
| 09/09/2026 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 09/03/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Identify the contents of the tank being proposed in this development plan. Reference: Section 107.2.1, IBC 2024 If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov. |
||
| 09/03/2026 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL REVIEWED BY: Krista Hansen – Lead Planner PDSD Zoning Review Section PROJECT: Airgas USA Tank Installation Development Package (1st Review) TD-DEV-0826-00217 (727 E EVANS BL) TRANSMITTAL DATE: 9/3/2026 Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is August 4, 2027. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) 2-06.4 CONTENT REQUIREMENTS 4.1.B.6 The administrative street address and relevant case numbers (DP, subdivision, rezoning, BOA, DDO, PDMR, TSMR, overlay, etc.). 1. COMMENT: 2-06.4.1.B.6 – Provide the development package case number, TD-DEV-0826-00217, adjacent to the title block on each sheet. 4.2 Required zoning and land use notes: 4.2.J. Required ratios and number of spaces provided for 1) standard, accessible, and van accessible vehicle parking spaces, 2) electric vehicle parking spaces 3) loading spaces, and 4) short- and long-term bicycle parking. 2. COMMENT: 2-06.4.2.J – Provide the information listed in the standard above. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Please resubmit revised drawings and any corrected plans along with a detailed response letter, stating how all Site Zoning Review comments were addressed. **Instructions for resubmittal - www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. ***For additional information on the standards presented in this memo, please refer to the City of Tucson Administrative Manual Section 2-06 or Technical Standards noted in the comments. If you have any questions about this transmittal, please contact Krista Hansen at Krista.Hansen@tucsonaz.gov |
||
| 08/06/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 08/13/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added TEP to the workflow. FYI notice sent out to TEP. | ||
| 08/13/2026 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | ||
| 09/01/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 08/06/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 08/10/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 09/09/2026 | ROW Engineering Review Standard | REVIEW COMPLETED |