Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0826-00213
Parcel: 13409016D

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0826-00213
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/19/2026 External Reviewers - COT Parks & Recreation Standard APPROVED Approved

Regarding: TD-DEV-0826-00213, the City of Tucson Parks and Recreation Department has no additional requirements for the Project and no further reviews by TPRD are required.

Parcel: 13409016D

Regards,
Joe Barr
Project Manager
Tucson Parks and Recreation
520-307-2811
11/09/2026 CDRC Post Review Express PENDING ASSIGNMENT
10/30/2026 Commercial Plumbing Standard REQUIRES RESUBMIT ACTIVITY NO. TD-DEV-0826-00213
ADDRESS/PARCEL: 396 S CAMINO SECO TUCSON, AZ 85710

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:

1. Please show the sanitary sewer connection for each building. Reference: Section 107.2.1, IBC 2024.
2. Keynote 59 shows a sewer line with a developed length of 106 feet between cleanouts. The maximum distance between cleanouts shall not exceed 100 feet, measured along the developed pipe length from the upstream entrance of the cleanout. Please provide an additional cleanout. Reference: Section 708.1.1, IPC 2024.
3. The nearest upstream manhole is identified as MH #8245-00 on the plans, but Pima Maps identifies it as MH #8245-04. Please clarify.
4. Please determine the need for a backwater valve for each building. Based on the RIM elevation of the nearest upstream manhole, backwater valves appear to be required for all units except Units 1 and 2. If the FFE is less than 12 inches above the elevation of the next upstream manhole, a backwater valve is required. Reference: Section 714.1, IPC 2024, as amended by the City of Tucson.
5. Please identify the type, size, and purpose of the proposed backflow preventer that is shown on the site plan. Also, provide the location and size of the proposed water lines. Reference: Section 107.2.1, IBC 2024.
10/15/2026 External Reviewers - Pima County Addressing Standard REQUIRES RESUBMIT See full Comment Letter in the attachments section*

Good morning,
Pima County Addressing is returning TD-DEV-0826-00213 with the attached comments.

Thank you,
David Wilging
Planner I - Addressing Division
Pima County Development Services
201 N. Stone Avenue 1st Floor
Tucson, Arizona 85701
520-724-6381
11/05/2026 Fire New Construction Standard REQUIRES RESUBMIT -Sheet 1/11, note #32 states no fire sprinklers are required. Please explain. Fire sprinklers will be required if these are classified as R2 occupancy group per the IBC. IFC 903.2.8.
-The fire dept. access for the north units is in excess of 150'. This will require a turnaround per IFC D103.4.
-If these are non-sprinklered buildings, the fire hydrant for the north units is too far. Hydrant required to be within 400' of the furthest portion of the farthest building, as the hose lays. IFC 507.5.1. Fire sprinkler requirements need to be resolved first to determine required fire hydrant distance.
john.vincent@tucsonaz.gov
5203495581
11/06/2026 NPPO Standard REQUIRES RESUBMIT See site landscape comments for additional clarification with regard to the NPP Plan and calculations.

Thank you.
Chad Keller, PLA
chad.keller@tucsonaz.gov
11/04/2026 ROW Engineering Review Standard REQUIRES RESUBMIT DTM Comment file has been added to attachments
11/09/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0826-00213 (1st Review)
Project: Multi-Family Development at 396 S Camino Seco
Location: 396 S CAMINO SECO
Review Date: 11/9/2026
Reviewer: Marco Contreras – Engineering Associate; Joe Macaulay – Civil Engineer
Reviewer Contact Information: marco.contreras@tucsonaz.gov; joe.macaulay@tucsonaz.gov


Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.

The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Review Comments:
1. Provide the development package case number (TD-DEV-0826-00213) adjacent to the title block on each sheet of the plan set. [AM 2-06.4.1.B.6]
2. Provide the following general note: Retaining walls and/or screen walls referenced on this plan are to be designed by others. Elevations shown hereon are for reference only. The contractor shall confirm exact elevations. All retaining/structural walls and/or screen walls require a separate building permit and are not covered under the grading permit for this project.
a. Ensure to update plan view keynotes/callouts on Site & grading sheets to state – “To be Built under separate permit” relating to all structural and retaining walls.
3. General note #13 – Revise the keynote provided, the City of Tucson adopted The IBC 2024 with ICC A117.1 2017 edition at the beginning of 2026
4. Revise the cover sheet to include the name, registration number, seal, and contact information for the Geotechnical Engineer of Record, along with the name and address of the geotechnical firm. This information shall be presented with the other project registrant contact information on the cover sheet. [Administrative manual 2-06.4.1.A.1]
5. Revise the cover sheet to include the name, registration number, seal, and contact information for the Civil Engineer of Record, along with the name and address of the geotechnical firm. This information shall be presented with the other project registrant contact information on the cover sheet. [AM 2-06.4.1.A.1]
6. Where a development is intended to provide centralized storage and collection to serve multiple buildings, tenants, or businesses, a general note must be included within the plan stating:
a. “A single property owner, property management company, or homeowners’ association (HOA), will be responsible for the management and maintenance of the solid waste collection services and storage area(s) for all development/business occupants.” [TSM 8-01.5.1.D]
7. Wheel Stops Required at Sidewalk-Adjacent Spaces - Wheel stops are required at all parking spaces that abut a sidewalk or pedestrian circulation path where the sidewalk width would be reduced to less than 4 feet by vehicle overhang. Sidewalks measuring 6.5 feet or greater in width are exempt from this requirement, as the additional width accommodates standard vehicle overhang without encroaching on the minimum 4-foot pedestrian clear zone. [UDC 7.4.6.H]
a. This will need to be addressed regarding the parking spaces shown NW of Unit 10
b. This will need to be addressed regarding the parking spaces shown at the SE corner portion of the site as well.
8. The surfacing construction detail #11 will need to be revised for the proposed interior roads/streets - a complete pavement section detail demonstrating compliance with UDC 7.4.6.I surfacing requirements. The detail(s) must address the following:
a. The pavement section design must be consistent with and supported by the geotechnical report recommendations. The report (Pg 12) recommends 3 inches of AC over 4 inches of Base Course. Revise the construction detail 11 provided on Sheet 4 accordingly. Keynotes etc should also be addressed across the plan set regarding surfacing.
9. Plan set Legend – revise/update the legend to clearly denote the intent/purpose of the triple dashed bold linework used.

Grading & Drainage Comments:
10. The trash enclosure details and grading plan sheets must be revised to correctly show the required drainage slopes at and around all trash enclosure locations per TSM 8-01.0.0. The following slope requirements must be reflected on both the detail sheets and the grading plan for every enclosure on the project: This will be very important to ensure ponding is not allowed to occur within the proposed enclosure.
a. The approach ramp and surrounding pavement must slope at a minimum of 2% away from the enclosure to prevent water intrusion and standing water at the enclosure pad.
b. The enclosure slab must slope at a minimum of 1% toward the gate to drain away from the enclosure interior.
c. These slope requirements must be explicitly labeled and dimensioned on the grading sheets and the enclosure detail for each enclosure location. A generic note referencing compliance is not sufficient — slopes must be graphically shown and confirmed on the plans.
11. The grading plan sheets are missing required floodplain information [AM 2-06.4.8.I]. Provide the following: [Drainage Manual 2.3.1.4.C] –
a. Water surface elevation (WSEL) contour cross sections associated with all floodplains and washes/Channels on or adjacent to the site.
b. Peak discharge rates (CFS) denoted at all points where floodplains and washes enter and exit the site.
12. Include spot elevations at curb cut inlets, landscaped water harvesting areas, and curb cut outlets for quick reference during site inspections.
13. The site and grading plans do not demonstrate that all proposed retention/detention basins and water harvesting basins comply with the minimum 10-foot setback from all structures as required by DSSDR Section 4.14.1.2 & 5.3.1.11. Evaluate and address the following for the basins proposed at the Western property boundary of the site: This requirement applies to both existing and proposed structures. As currently presented, the proposed Western basins appears to be close to the existing structures to the West.
a. Graphically depict and dimension the 10-foot minimum setback from all proposed basins to the nearest structure on the grading sheets. This setback applies to all building walls, foundations, and other structures adjacent to the basins.
b. Where any basin is proposed within the 10-foot minimum setback from a structure, a geotechnical justification must be included in the geotechnical report providing specific recommendations for a reduced setback, including analysis of potential impacts from infiltration, slope stability, and differential settlement on adjacent foundations.
c. Any reduced setback analysis must comply with Drainage Manual Section 14.2.6, which requires a minimum 30-foot-deep soil boring to be performed at or near the basin location to characterize subsurface soil and groundwater conditions used to support the reduced setback recommendation. The boring log and laboratory test results must be included in the geotechnical report.
d. Until the geotechnical report is received and reviewed, this item remains open. Any reduced setback approved by the geotechnical engineer must be clearly noted on the grading and site plans with reference to the supporting geotechnical report section and boring number.
e. If it is determined through the subsequent geotechnical report that a greater setback should be maintained, then the greater setback will need to be adhered to.
14. Provide a complete construction detail for the proposed riprap side-slopes/erosion protection that demonstrates compliance with DSSDR 4.7.1 side slope standards. The detail(s) must include, at minimum:
a. A filter fabric specification reference identifying the type, class, and placement requirements for the geotextile fabric to be used beneath the grouted riprap, in accordance with applicable ADOT or ASTM standards.
b. Unless grouted, rock riprap shall be underlain with filter fabric. The filter fabric shall be woven for a minimum of 2 feet into the upper end of the blanket and wrapped for a minimum of 2 feet around the riprap base of the blanket as illustrated in Figure 4.4
c. Denote the slope Gradient Units on the riprap detail.
15. All proposed retention and detention basins must be provided with a minimum of one sediment level measurement device per basin in accordance with DSSDR Section 4.4.1.4. The device may be incorporated into the basin outlet weir structure, embedded in the basin side slope, or constructed as a separate standalone marker. The device must be located where sediment is most likely to accumulate within the basin. Address the following on the plans:
a. Add a keynote and corresponding call-out on the grading sheets identifying the sediment level measurement device at each basin location.
b. Provide a construction detail for the selected device type showing its dimensions, materials, installation method, and graduated measurement markings.
c. The device detail and placement must be consistent across all three basins and must be incorporated into the inspection and maintenance protocol required by DSSDR Section 4.1.1.
16. Grading Plan – Revise plan view to denote the side slopes proposed for the basins shown
17. Detail 12 – Needs to be revised. Per the Project Geotechnical Report (Pattison Engineering), Table "Slope Protection," page 15, does not cover 1:1 slope treatments. It will be required that resubmission include geotechnical recommendations for this slope gradient or provide a supplemental geotechnical letter justifying a deviation from the report's recommendation.

Drainage Report Comments:
18. Riprap Sizing & Apron Dimensions – Confirm that the riprap classification (D₅₀ stone size) and apron dimensions (length, width, and depth) shown on the plans are consistent with the erosion protection calculations required. Provide the associated erosion riprap calculations. At a minimum, the following shall be substantiated at the Drainage Report: [Drainage Manual Chapter 9]
a. Riprap sizing (D₅₀): Shall be determined in accordance with Section 9 design procedures, accounting for the design discharge velocity, flow depth, and channel geometry at the outlet or protected reach.
b. Apron length and width: Shall reflect the hydraulic conditions (Froude number, tailwater depth, and flow spread) used in the energy dissipation analysis.
c. Apron depth/thickness: Shall satisfy the minimum blanket thickness requirements relative to the specified D₅₀.
d. Filter fabric / bedding layer: Confirm specification is consistent with Section 9 material requirements.
19. The report does not demonstrate drain-down compliance for the proposed basins as required by DSSDR Section 4.5. The resubmission must include a dedicated section that calculates and documents the drain-down time for each basin using results from site-specific infiltration testing. The section should showcase this drain down compliance using the results from the infiltration testing completed. (Refer to subsequent Geotechnical comment)
a. As the basins proposed show greater than 9-inches of retention volume, infiltration testing requirements apply
20. Drainage Report Introduction – the intro states “Site is within a regulated floodplain,” but also states a FPU will not be required. Revise accordingly
21. Provide a legal description of the specific parcel or parcels in question within the Introduction section of the report [Drainage Manual 2.3.1.2.A.3]
22. Revise the Introduction section 1.0. to briefly describe the type, size, and scope of the referenced project. [Drainage Manual 2.3.1.2.A.4]
23. A Long-Term Maintenance Responsibility section is absent from the report. This section is required by Drainage Manual Section 2.3.1.2.E and must identify the entity responsible for maintaining all proposed drainage improvements, including any retention/detention basins, outlet structures, and any riprap erosion protection. This section should immediately follow the Procedures/Methodology section. [Drainage Manual 2.3.1.2.E]
24. Further hydrological analysis is needed for the proposed channelization narrowing the existing 100-year floodplain through the site as proposed in the plan set.
a. Provide analysis and further determination of the impacts of the potential flow revisions to the wall and property to the west where the flows outfall.
b. Please provide both the mapped existing 100-year floodplain and proposed 100-year floodplain limits on the plans and any related drainage figures/exhibits.
c. Please provide updated information on the existing conditions and current outfall onto the property to the west, as the report does not mention the current opening in the wall with vaned metal fence.
25. Section I – ensure to include a “Required Permits” section that demonstrated that whether any other or no governmental permits are required for the scope of development. [Drainage Manual 2.3.1.2.F]
a. As work is shown to experience regulatory flows (Greater than 100 CFS), a Floodplain Use Permit from the City of Tucson will be required.
26. Provide scour depth calculations for this wash in accordance with the methodology established in Section 6.6 of the City of Tucson Drainage Standards Manual. Revise the drainage report to include a dedicated section presenting the scour analysis, supporting calculations, and engineering justification for any structures or improvements proposed within the setback.
27. Per City of Tucson Floodplain, Stormwater, and Erosion Hazard Management Section 29-16, the channel and banks of the wash containing vegetative resources and wildlife habitat areas is called the resource area. Where alteration to any portion of the resource area is proposed, the applicant for a development permit is required to demonstrate why the resource area cannot be left in its natural condition. If encroachment into designated PRA is proposed, an environmental resource report (ERR) will be required per TSM 4-02.2.5.B.
a. Where any development, except planting solely for revegetation, restoration or enhancement with an approved Floodplain Restoration Plan, encroaches within the protected riparian areas, mitigation will be required. A mitigation report shall be submitted with the Environmental Resource Report demonstrating that the proposed mitigation is in conformance with this subsection and applicable codes. [TSM 4-02.2.5.B.3]

Geotechnical Comments:
28. Detention basins with uniform side slopes and no terraces may incorporate retention for a maximum depth of 9” below the lowest outlet elevation. The volume provided below the outlet can be counted as retention volume. If infiltration testing is provided, the retained depth may be increased. [DSSDR 2.5]
a. It will be required that infiltration testing be completed for the proposed basin to demonstrate compliance with required drain down times. [DSSDR 4.5.1.1]. For resubmission, ensure to revise the geotechnical report to include this analysis. (Refer to subsequent drainage report comment for further details). It will need to be demonstrated that drain down times are compliant [DSSDR Section 4.5] If basins do not demonstrate proper drain-down, redesign will be required.
11/06/2026 Site Landscape Standard REQUIRES RESUBMIT PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, PLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: MULTI-FAMILY DEVELOPMENT
ACTIVITY NO: TD-DEV-0826-00213
ADDRESS: 396 S CAMINO SECO
ZONING: OFFICE ZONE (O-3)
LAND USE PER UDC TABLE 7.6.4-1: MULTIFAMILY
11.6.2026

THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING, PER-THE-CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM).

RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Can the WHIA number 5 be extended to the south to include the additional plants in that area that make up the street landscape border?

2. Some of the roof top drainage is not included as part of the subwatershed data, (e.g. units 11 and 13). Show flowlines on the rainwater harvesting plans to indicate flow direction in general on site toward curb cuts and off the roof to downspout, to scupper etc. Include a few general spot elevations on the commercial rainwater harvesting plans that match the grading plan.

3. Add notation on the commercial rainwater harvesting plan to see civil grading plan for detailed information on basin construction, grades, and any other items that would need to be detailed.

4. Include the size of meter needed on the irrigation system on the irrigation schedule/legend.

5. Include the plant coverage data for the Old Spanish Trail street landscape border. The plant coverage number looks low compared to what is detailed in the chart and it is not duplicated on the landscape border calculation table.

6. There are a couple of fishhook barrels on site. They require their own calculations and mitigation at the 2:1 ratio. Provide calculations for this protected species.

7. A separate native plant preservation worksheet for each species of plant is required, E.G. Three species of tree and one species of protected cactus. This project does include credits for additional preserve in place, but I believe each species needs to be run through the preservation worksheet and will likely result in a few mitigation plant additions to the planting plan.
- See Administrative Manual 2-11.5.4 EXHIBIT I: NATIVE PLANT PRESERVATION WORKSHEET
This worksheet outlines the steps needed to calculate numbers for meeting the minimum standards, preservation credits, and mitigation requirements of the Native Plant Preservation Ordinance utilizing the Plant Inventory Methodology. This Worksheet has been designed to assist in calculating the numbers of plants needed for the Salvage and Mitigation Report described in Section 2-11.5.0; however, this particular Worksheet is not required as part of the submittal, but the calculations are required. Fill out a separate worksheet for ***EVERY GENUS AND SPECIES OF PLANT.

8. Prior to site landscape approval, ensure that Site Zoning and Site Engineering comments are fully addressed.

9. Include the Activity Number TD-DEV-0826-00213 on all sheets in the plan set.

Thank you.

CHAD KELLER, PLA
LANDSCAPE ARCHITECT

CITY OF TUCSON, PDSD, SITE REVIEW SECTION
CHAD.KELLER@TUCSONAZ.GOV
520.837.4923
10/29/2026 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

REVIEWED BY: Jeffrey Cassidy – Planner I
PDSD Current Zoning Commercial Review Section

PROJECT:
Multi-Family Development at 396 S Camino Seco
Development Package (1st Review)
TD-DEV-0826-00213
396 S CAMINO SECO TUCSON, AZ 85710
O-3 Zoning

TRANSMITTAL DATE:
October 29, 2026

Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is August 02, 2027.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-8753

1. COMMENT: Provide the development package case number, TD-DEV-0826-00213, adjacent to the title block on each sheet. (AM 2-06.4.1.B.6).

2. COMMENT: On the cover sheet, add general note(s) indicate that this development is subject to the Major Streets and Routes (MS&R) per UDC 5.4. (AM 2-06.4.2.F).

3. COMMENT: On the cover sheet, update the South setback from 50’-0” to 10’-0” as it is a non-residential use along E Old Spanish Tr is a MS & R Collector. (AM 2-06.4.7.G).

4. COMMENT: On the cover sheet, note #26, provide sequence number for all new easements. Otherwise, a condition prior to issuance will be placed on the development package. (AM 2-06.4.7.I).

5. COMMENT: Additional comments may be forthcoming on the next review based on responses to Zoning and other PDSD reviewer comments.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Please resubmit revised drawings and any corrected plans along with a detailed response letter, stating how all Site Zoning Review comments were addressed.

**Instructions for resubmittal - www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.

***For additional information on the standards presented in this memo, please refer to the City of Tucson Administrative Manual Section 2-06 or Technical Standards noted in the comments.

If you have any questions about this transmittal, please contact Jeffrey.cassidy@tucsonaz.gov
10/15/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC Added Parks, Addressing, PAG, USPS, SWG, and TEP to the workflow. FYI notice sent out to PAG, USPS, SWG, and TEP
10/15/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
10/15/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
10/15/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
10/15/2026 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
10/12/2026 OK to Submit - Engineering Fast REVIEW COMPLETED
10/14/2026 OK to Submit - Zoning Fast REVIEW COMPLETED
11/03/2026 ROW Review REVIEW COMPLETED