Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-0825-00219
Parcel: 116161590

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0825-00219
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/19/2025 NPPO Standard APPROVED
09/19/2025 Site Landscape Standard NOT REQUIRED
08/25/2025 External Reviewers - Pima County Wastewater (RWRD) Standard REQUIRES RESUBMIT The applicant is responsible for obtaining review and approval by Pima County, for projects involving RWRD sewers, on-site wastewater treatment facilities and public water systems https://www.pima.gov/1766/Wastewater-Reclamation. The applicant must provide an Approval letter from RWRD, prior to PDSD Approving the permit.
08/29/2025 External Reviewers - Pima County Wastewater (RWRD) Standard REQUIRES RESUBMIT The applicant is responsible for obtaining review and approval by Pima County, for projects involving RWRD sewers, on-site wastewater treatment facilities and public water systems https://www.pima.gov/1766/Wastewater-Reclamation. The applicant must provide an Approval letter from RWRD, prior to PDSD Approving the permit.
09/16/2025 ROW Engineering Review Standard REQUIRES RESUBMIT Max Driveway width is 30' for shared driveway
Transition Vertical curb to Wedge curb along Contzen ave
Show onsite pedestrian circulation to public sidewalk for lots 1, 3, 5
Provide turning movements for additional parking spots on lots 1,3, and 5 to show design provides adequate space for maneuverability. Recommend rearranging parking/driveway configuration through access easements.
09/15/2025 Site Engineering Standard REQUIRES RESUBMIT TD-DEV-0825-00219
1008 N CONTZEN AV

Site engineering comments are as follows:

1. Detention may be waived, however please show how First Flush Retention is going to be met for this development in accordance with Chapter 2 of the Design Standards for Stormwater Detention and Retention (DSSDR). A drainage statement is required for this development.
2. Show physical separation between the “flag” portions of the northeastern lots and the access for the adjacent lots on Contzen Ave.
3. Show Sight Visibility Triangles compliant with Technical Standards Manual [10-01.5.0].
4. The maximum length of a curb cut providing access for two lots is 30 feet. Access Management Guidelines Ch 5 Section 5.8.

https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-12213

https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/access_management_guidelines_update_december_2011_final.pdf

https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf

Ryan Insalaco
Engineering Associate
ryan.insalaco@tucsonaz.gov
09/23/2025 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

TO:
Development Services Department
Plans Coordination Office

FROM:
Fernando Garcia
PDSD Zoning Review Section

PROJECT:
Tentative Plat
1008 N Contzen Av, Tucson, AZ 85705
TD-DEV-0825-00219 (1st Review)

TRANSMITTAL DATE: September 23, 2025

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is September 19, 2025.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown.

1. COMMENT: 2-06.4.9.O – The minimum required setback to adjacent residential parcels is either 6’ or 2/3 the height of the adjacent structure’s wall height, whichever is greater. The carport awning (Key Note 3) indicates posts. The height of the carport is not clear. Is the height the same as the main dwelling (17.9’)? If so, then 2/3 of 17.9’ is 11.8’, which is greater than the 6’ setback currently shown. A Design Development Option (DDO) would be required to permit this reduced setback.

If the height of the carport is not 17.9’, clarify its height as measured from design grade to the flat roof, or in the case of gabled roof, the midpoint between ridge and eave. If 2/3 of this measurement is still greater than the 6’ setback depicted, then either a greater setback or a DDO will be required.

Provide clear setback dimensions from each structure, including the carports, to the adjacent property lines.

Physical separation – in the form of walls, fences, or landscape screening – between the flags of each parcel and the adjoining parcels in order to clearly demonstrate that each parcel functions independently without sharing access.

2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

2. COMMENT: 2-06.4.9.Q – Provide height of carports.



***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations


If you have any questions about this transmittal, contact Site Zoning Reviewer Fernando Garcia at fernando.garcia2@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
08/21/2025 CDRC Application Completeness Express REVIEW COMPLETED
08/25/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added. TEP, ROW, ADOT, ASSESSORS, ADDRESSING, RWRD, WATER, and SWG USPS, and PAG to the workflow. Review request email sent to TEP, ADOT, ASSESSORS, ADDRESSING. FYI email sent to, SWG USPS PAG.
09/18/2025 Commercial Plumbing Standard REVIEW COMPLETED
08/29/2025 External Reviewers - Arizona Department of Transportation (ADOT) Standard REVIEW COMPLETED Good Afternoon,

ADOT has reviewed this DEV and has no comments.

Thank you for the opportunity to review.
09/22/2025 External Reviewers - Pima County Addressing Standard REVIEW COMPLETED Nicholas Jordan
on behalf of
Addressing
​CDRC​
Good afternoon,



Pima County Addressing approves TD-DEV-0825-00219.



Nicholas Jordan

Site Review Project Manager II – Addressing Official

Pima County Development Services Department

201 N Stone AV – 1st Floor

Tucson, AZ 85701

(520) 724-9623
08/25/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
10/02/2025 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED Permit Number: TD-DEV-0825-00219
Permit Type: Development Package
Description: This project consists of developing these parcels to create a block plat of 6 individual lots for SFR
Address: Main Address: 1008 N CONTZEN AV TUCSON 85705
Parcel: 116161560
City of Tucson Project?: [none]
Project Name/Title: CASITAS AT BARRIO ANITA I LOTS 1-6

Tucson Electric Power Co., (TEP) has reviewed and approves the Tentative Plat for Casitas at Barrio Anita submitted on August 25, 2025.



In order for TEP to prepare an electrical design for this subdivision, please email a copy of the Approved Tentative Plat and the subdivision AutoCAD file, including water plans, to Amanda Whitney, Project Manager at awhitney@tep.com.



Easements for electrical facilities must be shown on the Final Plat in order for TEP to approve the plat.



If you have any questions, please contact met at 520-965-4030.



Liza Castillo

Right-of-Way Consultant for

Tucson Electric Power Co.

Land Resources

(520) 965-4030

tepdevrev@tep.com
08/25/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
09/16/2025 Fire New Construction Standard REVIEW COMPLETED
08/25/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
08/22/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
08/27/2025 TW New Development Review REVIEW COMPLETED Tucson Water has no objections to this proposed development package.