Permit Number: TD-DEV-0824-00241
Parcel: 122161300

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0824-00241
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/16/2024 Commercial Plumbing APPROVED
09/16/2024 Site Engineering APPROVED
09/11/2024 Site Zoning APPROVED
09/17/2024 NPPO NOT REQUIRED See site landscape comments for recommendation on the NPPO Waiver for project completeness.

Thank you.
Chad Keller, RLA
chad.keller@tucsonaz.gov
09/27/2024 CDRC Post Review Express PENDING ASSIGNMENT
09/17/2024 Site Landscape REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
PDSD SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: TUCSON WATER WELL B-057B-SCADA UPGRADES TO EXISTING FACILITY
ACTIVITY NO: TD-DEV-0824-00241
ADDRESS: 3801 E HAMPTON ST
ZONING: R-1 RESIDENCE ZONE
LAND USE: UTILITY SERVICE

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:
1. Ensure that Zoning and Engineering comments are addressed prior to site landscape section approval.

2. A NPPP is not required, as this site has no protected native vegetation. For project completeness it would be great to have the NPPO Waiver on file as part of the approved development package.

3. Label sight visibility triangles on all landscape plans.

4. There are two street landscape borders on the site along Hampton St. The total of 45 feet of street landscape border shown on the plan is bisected by the 18-foot driveway. A minimum of one canopy tree is required in all landscape borders per UDC 7.6.4.C.1.a & b. Provide an additional canopy tree within the west street landscape border.

If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov, or at 520.837.4923
08/29/2024 CDRC Application Completeness Express REVIEW COMPLETED
09/10/2024 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added TEP to the workflow. Review request email sent to TEP.
09/27/2024 External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED September 26, 2024
WO#T127768
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Well Site B-057B SCADA Upgrade
TD-DEV-0824-00241
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 9/10/2024. There are existing facilities within the development which are
depicted upon the plan; however, there are no apparent conflicts with the existing
transformer. Further, please see Docket 9762 Page 798, attached.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Salazar
(520) 305-6713
msalazar@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
09/10/2024 Fire New Construction REVIEW COMPLETED
09/09/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
09/09/2024 OK to Submit - Landscape Fast REVIEW COMPLETED
09/06/2024 OK to Submit - Zoning Fast REVIEW COMPLETED
09/11/2024 ROW Engineering Review REVIEW COMPLETED DTM has no comments.