Permit Number: TD-DEV-0823-00366
Parcel: 11807237C

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0823-00366
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/28/2023 Commercial Plumbing APPROVED
09/28/2023 External Reviewers - Tucson Airport Authority APPROVED The Tucson Airport Authority approves the proposed project and is not requiring a resubmit of this project.
09/27/2023 ROW Engineering Review APPROVED
09/19/2023 Site Engineering APPROVED
09/01/2023 NPPO NOT REQUIRED
09/28/2023 CDRC Post Review Express PENDING ASSIGNMENT
09/01/2023 Site Landscape REQUIRES RESUBMIT COMMENTS:
1. Ensure that Zoning, Engineering comments, and concerns are addressed prior to landscape section approval.
2. Label all sheet with the correct development package number TD-DEV-0823-00366.

If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988
09/20/2023 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Wyatt Berger
Lead Planner

PROJECT: The Mission at Sentinel Peak
Development Package (1st Review)
TD-DEV-0823-00366

TRANSMITTAL DATE: September 20, 2023

DUE DATE: September 28, 2023

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM).

Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is September 20, 2024.

1. COMMENT: 2-06.4.2.D – Ensure that sheets 4 and 5 provide the page number and total number of pages in the development package drawings (i.e., page 4 of 5).

2. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0823-00366, adjacent to the title block on all sheets. Additionally, provide relevant rezoning case numbers C9-81-03 and C9-83-23 adjacent to the title block on all sheets.

3. COMMENT: 2-06.4.8.C – Provide the width and recordation data for all rights-of-way adjacent to the site.

4. COMMENT: 2-06.4.9.H.5 – Back-up spurs with a minimum of three feet in depth, three foot radii, and wheel barriers are required to be provided adjacent to the proposed rolling gates and motor vehicle parking spaces. Additionally, a minimum distance of three feet must be provided between the back-up spur and the rolling gate (UDC 7.4.6.F.4).

5. COMMENT: 2-06.4.9.Q – Provide the height of the proposed shade canopy on Building 33.

6. COMMENT: 2-06.4.9.W – Ensure that the proposed handicapped parking signs do not decrease the minimum width of any sidewalks to less than four feet (TSM 7-01.4.3.A).

If you have any questions about this transmittal, please contact me at Wyatt.Berger@tucsonaz.gov or at (520) 837-4951.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
08/22/2023 CDRC Application Completeness Express REVIEW COMPLETED
08/29/2023 CDRC Review Coordinator Express REVIEW COMPLETED Added external reviewers, sent emails and sent FYI emails per SOP.
09/15/2023 External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED [EXTERNAL] Re: DUE SEPTEMBER 28, 2023 / New security fencing, vehicle & pedestrian gates, and vehicle drive within the site. / TD-DEV-0823-00366

Jay Gomes
CDRC
Good Morning,

ADOT has no comments on this DEV.

Thank you for the opportunity to review.
08/29/2023 External Reviewers - Pima Association of Governments REVIEW COMPLETED Sent FYI emails per SOP.
08/29/2023 External Reviewers - Southwest Gas REVIEW COMPLETED Sent FYI emails per SOP.
08/29/2023 External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Sent FYI emails per SOP.
08/29/2023 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED Sent FYI emails per SOP.
08/30/2023 Fire New Construction REVIEW COMPLETED
08/22/2023 OK to Submit - Engineering Fast REVIEW COMPLETED
08/22/2023 OK to Submit - Landscape Fast REVIEW COMPLETED
08/23/2023 OK to Submit - Zoning Fast REVIEW COMPLETED