Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0823-00361
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/21/2023 | OK to Submit - Zoning | APPLICATION INCOMPLETE | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Tucson Specialty Hospital – Building & Canopy Addition 7220 E. Rosewood St. – PAD-3 TD-DEV-0823-00361 Development Package OK to Submit (1st Review) TRANSMITTAL DATE: August 21, 2023 The development package has been reviewed by the Zoning Review Section for minimal compliance with the requirements of the Administrative Manual (AM) 2-06. It has been determined that the submitted plans do not provide sufficient information to complete a plan review. The following items need to be addressed prior to re-submittal. 1. The plans submitted are the building plan set and do not meet the requirements of Administrative Manual (AM) 2-06. 2. There are now two (2) Development Packages (DPs) submitted for the proposed additions on this site, TD-DEV-0223-00136, and this plan TD-DEV-0823-00361, withdraw DP TD-DEV-0823-00361. This review is a cursory review for compliance with the Checklist for Minor Changes to Commercial/Industrial Sites and does not constitute a complete review. Addition comments maybe forth coming once the plan is accepted for review. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. |
||
08/21/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
08/21/2023 | CDRC Review Coordinator | PENDING ASSIGNMENT | |||
08/21/2023 | Commercial Plumbing | PENDING ASSIGNMENT | |||
08/21/2023 | Fire New Construction | PENDING ASSIGNMENT | |||
08/21/2023 | NPPO | PENDING ASSIGNMENT | |||
08/21/2023 | ROW Engineering Review | PENDING ASSIGNMENT | |||
08/21/2023 | Site Engineering | PENDING ASSIGNMENT | |||
08/21/2023 | Site Landscape | PENDING ASSIGNMENT | |||
08/21/2023 | Site Zoning | PENDING ASSIGNMENT | |||
08/18/2023 | OK to Submit - Engineering | REQUIRES RESUBMIT | 1. Please remove the construction plans from the plan set and only provide a site plan and relevant details. The construction plans will be reviewed with the associated building permit. Lianne Evans lianne.evans@tucsonaz.gov |
||
08/18/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
08/18/2023 | OK to Submit - Landscape | REVIEW COMPLETED |