Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0726-00203
Parcel: 10707021B

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0726-00203
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/29/2026 CDRC Review Coordinator Express PENDING ASSIGNMENT
07/29/2026 Commercial Plumbing Standard PENDING ASSIGNMENT
07/29/2026 Fire New Construction Standard PENDING ASSIGNMENT
07/29/2026 NPPO Standard PENDING ASSIGNMENT
07/29/2026 ROW Engineering Review Standard PENDING ASSIGNMENT
07/29/2026 Site Engineering Standard PENDING ASSIGNMENT
07/29/2026 Site Landscape Standard PENDING ASSIGNMENT
07/29/2026 Site Zoning Standard PENDING ASSIGNMENT
07/27/2026 OK to Submit - Engineering Fast REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0726-00203 (OK To Submit Review)
Project: New construction of the PYDC Career Pivot Center, including the building, associated site improvements, utility connections, parking, landscaping, exterior lighting, drainage, and related infrastructure. The facility will provide workforce development, vocational training, education, and support spaces for program participants.
Location: 2455 N FAIRVIEW AV
Review Date: 7/27/2026
Reviewer: Marco Contreras – Engineering Associate
Reviewer Contact Information: marco.contreras@tucsonaz.gov
Related cases:

Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.
The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Application Completeness Review Comments:
NOTICE: This is a completeness check review performed by both Site Engineering & Zoning to determine whether the submission in question is sufficient for full review by all applicable reviewing parties. As such, do not interpret the provided comments as finalized complete review comments. They are simply to address outstanding issues caught at this stage of submission.

1. Application incomplete, please provide the following for resubmission:
a. Geotechnical Report – A site-specific geotechnical investigation report prepared by a licensed geotechnical engineer is required [IBC 1803]. The report shall address soil bearing capacity, site classifications, expansive soils, groundwater conditions, necessary drainage infrastructure setbacks, and any recommendations for foundation design as applicable to the proposed construction.
07/29/2026 OK to Submit - Zoning Fast REQUIRES RESUBMIT 1. COMMENT: Please update the General Note stating the existing and proposed use. Provide a UDC identified use per UDC Article 11.3. It appears the use is Civic - Civic Assembly subject to UDC 4.9.13.Q (see definition below).
Definition of Civic Assembly - 'An establishment used to hold meetings, conventions or trade fairs, exhibitions, or other community, social, and multipurpose uses. Typical uses include convention centers, neighborhood centers, and community centers.'
If you do not believe this is the correct use, please identify another use from the UDC.
2. COMMENT: Include the development package case number, TD-DEV-0726-00203, in the bottom right corner of each sheet of the plan set adjacent to the title block,
3. COMMENT: Address Site Engineering comments.

Loran Shamis
loran.shamis@tucsonaz.gov
07/27/2026 CDRC Application Completeness Express REVIEW COMPLETED