Permit Review Detail
Review Status: In Review
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0726-00201
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/04/2026 | Historic | NOT REQUIRED | Historic review not required as the project site does not have HPZ, HL, or HLS overlay zoning, nor is it located within any other special district that requires Historic review. | ||
| N/A | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| N/A | External Reviewers - Arizona Department of Transportation (ADOT) Standard | PENDING ASSIGNMENT | |||
| N/A | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| N/A | NPPO Standard | PENDING ASSIGNMENT | |||
| N/A | ROW Engineering Review Standard | PENDING ASSIGNMENT | |||
| N/A | Site Landscape Standard | PENDING ASSIGNMENT | |||
| N/A | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 08/06/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-0726-00201 (1st Review) Project: THE WORK CONSISTS OF A DEVELOPMENT PACKAGE FOR IGNITE SIGN ART MUSEUM. THE DEVELOPMENT PACKAGE IS DUE TO A CHANGE OF USE REQUIRING THE SITE TO BE BROUGHT INTO CONFORMANCE. Location: 331 S OLSEN AV Review Date: 8/6/2026 Reviewer: Marco Contreras – Engineering Associate & Joe Macaulay – Civil Engineer Reviewer Contact Information: marco.contreras@tucsonaz.gov Related cases: Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards. The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files. Applicable Code Links for quick/direct reference: City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593 Site Engineering Review Comments: 1. Provide the development package case number (TD-DEV-0726-00201) adjacent to the title block on each sheet of the plan set. [AM 2-06.3.3] 2. Review and revise the XX of XX-page indictor – it appears they were not updated to account for the 3 total pages shown. [AM 2-06.4.2.D] a. Ensure to update the sheet index accordingly. 3. As this proposal is a change of use to a commercial site that utilizes APC’s, and includes the continuation of use of APC’s - Environmental services approval will be required to accept that they will have no issues in regard to servicing this commercial property within this method (APC’s continuation). The contact to reach out to at ES will be Andy Vera at Andy.vera@tucsonaz.gov. Please submit the approval provided for the resubmission of this development package. a. If approval is given, ensure to be aware that this request will be managed as a TSMR which will require the submission of a Technical Standards Modification Request at time of resubmission of this development package. 4. The plans do not demonstrate compliance with TSM 8-01.5.1.A, which requires that adequate space be provided for both solid waste and recycling collection services. Revise the plans to clearly show that each proposed APC provides designated separate space for solid waste containers and recycling containers. a. If approval to comment #3 is achieved, recycling would be allowed to be thru APC service. 5. Provide dimension to the alley way along the Eastern property boundary. 6. Pedestrian circulation is required to connect all buildings, dumpster areas, common areas, and the sidewalk on all the street frontages [TSM 7-01.3.3]. Demonstrate how this requirement is addressed for connecting the site to the proposed APC location at the SE corner of the site. |
||
| 07/24/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 07/29/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added Adot,, PAG, USPS, SWG, and TEP to the workflow. FYI notice sent out to PAG, USPS, SWG, and TEP. | ||
| 08/07/2026 | Design Review Standard | REVIEW COMPLETED | If the Sunshine Mile District Urban Overlay Zone (SMD) will be used as a tool for redevelopment, please let me know: maria.gayosso@tucsonaz.gov and request a presubmittal conference via TDC Online, so we can schedule a presubmittal meeting with a Design Professional and staff. if the SMD will be pursued, a complete Design Package will need to be submitted as a subrecord of TD-DEV-0726-00201, following these instructions: https://www.tucsonaz.gov/files/sharedassets/public/v/3/pdsd/documents/submission-documents/special_districts_application_instructions_7.18.23.pdf. Here's an overview of the SMD: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/smd_handout_forweb_082724.pdf. If you have any questions, please let me know: maria.gayosso@tucsonaz.gov. Thank you. | ||
| 07/29/2026 | External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | ||
| 07/29/2026 | External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | ||
| 07/29/2026 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | ||
| 07/29/2026 | External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | ||
| 07/27/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 07/27/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED |