Permit Number: TD-DEV-0726-00193
Parcel: 10120036M

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0726-00193
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/20/2026 CDRC Review Coordinator Express PENDING ASSIGNMENT
07/20/2026 Commercial Plumbing Standard PENDING ASSIGNMENT
07/20/2026 Fire New Construction Standard PENDING ASSIGNMENT
07/20/2026 NPPO Standard PENDING ASSIGNMENT
07/20/2026 ROW Engineering Review Standard PENDING ASSIGNMENT
07/20/2026 ROW Review PENDING ASSIGNMENT
07/20/2026 Site Engineering Standard PENDING ASSIGNMENT
07/20/2026 Site Landscape Standard PENDING ASSIGNMENT
07/20/2026 Site Zoning Standard PENDING ASSIGNMENT
07/17/2026 OK to Submit - Engineering Fast REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0726-00193 (OK To Submit Review)
Project: This site is a proposed Allsup's Gas Station with 7 MPD's and a 5,630 sf Convenience Store.
Location: 3170 W EL CAMINO DEL CERRO
Review Date: 7/17/2026
Reviewer: Marco Contreras – Engineering Associate
Reviewer Contact Information: marco.contreras@tucsonaz.gov
Related cases:

Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.
The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Review Comments:
NOTICE: This is a completeness check review performed by both Site Engineering & Zoning to determine whether the submission in question is sufficient for full review by all applicable reviewing parties. As such, do not interpret the provided comments as finalized complete review comments. They are simply to address outstanding issues caught at this stage of submission.

1. Application Incomplete, please provide the following in resubmission:
1. Provide an earthwork table that provides: preferably on the cover sheet
i. Cut & Fill quantities associated with the proposed grading & construction
ii. Total area of disturbance in both square footage & acres.
2. Geotechnical Report – A site-specific geotechnical investigation report prepared by a licensed geotechnical engineer is required [IBC 1803]. The report shall address soil bearing capacity, site classifications, expansive soils, groundwater conditions, necessary drainage infrastructure setbacks, and any recommendations for foundation design as applicable to the proposed construction.
3. It is recommended that the civil engineer(s) review the City of Tucson Drainage Manual prior to resubmission. It will be necessary that the City of Tucson Flood Peak Estimation Method and standards be used and followed for the proposed drainage design of the site. The following references from the Standards Manual for Drainage Design and Floodplain Management (COT Drainage Manual) and the Design Standards for Stormwater Detention and Retention Manual (DSSDR) shall govern report preparation:
i. Report Formatting & Content: COT Drainage Manual §2.3; DSSDR Chapter 10
ii. Flood Peak Estimation: COT Drainage Manual Chapter 4
iii. Erosion Hazard Assessment: COT Drainage Manual Chapters 6 & 7
iv. Drainage Facility Design Standards: COT Drainage Manual Chapters 9–11
v. First-Flush Retention & Detention Guidelines/Triggers: DSSDR Chapters 2, 3, & 4
07/20/2026 OK to Submit - Zoning Fast REQUIRES RESUBMIT 1. COMMENT: Include a general note stating the existing use and the proposed use. It appears "the existing use is Civic - Educational Use, Instructional School and the proposed use is Retail - General Merchandise Sales, excluding Large Retail Establishment subject to use specific standard 4.9.13.Q."
2. COMMENT: Include a general note stating the existing and proposed zone is I-2.
3. COMMENT: Include the development package case number, TD-DEV-0726-00193, in the bottom right hand corner on each sheet of the plan set, adjacent to the title block.
4. COMMENT: Address Site Engineering comments.

Loran Shamis
loran.shamis@tucsonaz.gov
07/16/2026 CDRC Application Completeness Express REVIEW COMPLETED