Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0726-00181
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/31/2026 | NPPO Standard | APPROVED | |||
| 07/10/2026 | Site Engineering Standard | APPROVED | |||
| 07/31/2026 | Site Landscape Standard | APPROVED | |||
| 07/30/2026 | Site Zoning Standard | APPROVED | Associated CIP (CIP-0825-00021) received prior approvals. | ||
| 07/30/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Revise the Plumbing General Requirements (sheet P1) to refer to the 2024 editions of the IBC, IMC, IPC, IFGC, IECC and the IFC, as adopted by the City of Tucson. 2. PVC is not approved for use in a water distribution system within a building. (See entries for domestic water piping above grade and below the slab, in the Plumbing General Requirements.) Reference: Section 605.4, IPC 2024. 3. Correct the label of detail 2/P1: the detail does not include any how water. If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov |
||
| 07/09/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 07/26/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 07/30/2026 | ROW Engineering Review Standard | REVIEW COMPLETED |