Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0725-00203
Parcel: 115211530

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0725-00203
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/22/2025 Site Engineering Standard APPROVED
08/27/2025 Site Zoning Standard APPROVED
08/29/2025 NPPO Standard NOT REQUIRED
08/29/2025 Site Landscape Standard REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: EXTERIOR SITE ACCESSIBILITY UPDATES TO THE EXISTING ALBERTSONS PARKING LOT AND PEDESTRIAN ROUTE
ACTIVITY NO: TD-DEV-0725-00203
ADDRESS: 1350 N SILVERBELL RD
ZONING: C-1 COMMERCIAL ZONE

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape and NPPO Section review comments have been addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Removal of the asphalt and preparation of the base course for new asphalt could affect the health of the existing mature canopy trees. Provide clear direction to the contractor on the plans that tree preservation is a priority. If tree roots are encountered during construction, it will be important to preserve them and not cut them. If the trees die due to this construction activity, they will need to be replaced and likely will result in additional mitigation requirements.

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
08/01/2025 CDRC Application Completeness Express REVIEW COMPLETED
08/05/2025 CDRC Review Coordinator Express REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/26/2025 Commercial Plumbing Standard REVIEW COMPLETED
08/05/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/05/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/05/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/21/2025 Fire New Construction Standard REVIEW COMPLETED
08/04/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
08/05/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
08/07/2025 ROW Engineering Review Standard REVIEW COMPLETED
08/06/2025 ROW Review REVIEW COMPLETED