Permit Number: TD-DEV-0725-00192
Parcel: 133072500

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0725-00192
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/19/2025 NPPO Standard NOT REQUIRED
08/18/2025 Site Landscape Standard NOT REQUIRED
11/04/2025 Floodplain Administration Review Standard REQUIRES RESUBMIT Deferred for resubmittal
08/13/2025 Site Engineering Standard REQUIRES RESUBMIT 1. Please provide the scour calculations for the gabion wall.
2. These plans need to be stamped by a registered professional engineer.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
08/20/2025 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM:
Bobby Parsons
PDSD Zoning Review Section

PROJECT:
8625 E Pembrook Dr. Tucson, AZ 85715
Development Package (1st Review)
TD-DEV-0725-00192

TRANSMITTAL DATE: 8/20/2025
DUE DATE: 8/20/2025

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is July 30, 2026.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

1. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-0725-00192, adjacent to the title block on each sheet.

2-06.4.4.A - Show the subject property approximately centered within the one square mile area;

2. COMMENT: 2-06.4.4.A – Please show the site centered in the location map as noted by the standard above.

2-06.4.4.C - Section, township, and range; section corners; north arrow; and the scale will be labeled.

3. COMMENT: 2-06.4.4.C – Please include the information as noted by the standard above including section corners.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

Zoning and Land Use Notes

2-06.4.7.A.1 - List as a general note: "Existing zoning is ____."

4. COMMENT: 2-06.4.7.A.1 – Please include the zoning as noted by the standard above.

2-06.4.7.A.2 - List the gross area of the site/subdivision by square footage and acreage.

5. COMMENT: 2-06.4.7.A.2 – Please include the information as noted by the standard above.

2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

6. COMMENT: 2-06.4.7.A.4 – Please include the information as noted by the standard above.

2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan.

7. COMMENT: 2-06.4.7.A.6 – Include a note stating “this project is designed to meet the overlay zone(s) criteria. UDC Article 5.4 Major Streets and Routes Setback Zone (MS&R).

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

2-06.4.8.A - Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system.

8. COMMENT: 2-06.4.8.A – Please provide the information as noted by the standard above including subdivision perimeter information.

2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks.

9. COMMENT: 2-06.4.8.C – Please include the information as noted by the standard above for E. Wrightstown Road.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. If the property is being rezoned, use those boundaries and classifications. The basis for this requirement is that some zoning requirements on a project are based on the zoning classification of adjacent property. Also, in some instances, each zone has to be taken into consideration on property that is split by two or more zoning classifications, as each may have different requirements.

10. COMMENT: 2-06.4.9.F – Please include the information as noted by the standard above.

2-06.4.9.H.4 - Indicate if existing streets are public or private; provide street names, widths, curbs, sidewalks, and utility locations, all fully dimensioned.

11. COMMENT: 2-06.4.9.H.4 – Include the information as noted by the standard above for E. Wrightstown Road.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations


If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
07/30/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS grading only.
CDRC has added TEP only.
08/20/2025 Commercial Plumbing Standard REVIEW COMPLETED
08/14/2025 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED 4350 E. Irvington Road
Post Office Box 711, Tucson, AZ 85702
August 13, 2025
WO#T158492
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Project Name/Title: Wrightstown
TD-DEV-0725-00192
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 7/30/2025. There are existing facilities within the development which are
not depicted upon the plan. There are no apparent conflicts at this time.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Rodriguez
(520) 991-5495
mrodriguez@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
08/18/2025 Fire New Construction Standard REVIEW COMPLETED
07/30/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
08/06/2025 ROW Engineering Review Standard REVIEW COMPLETED DTM ROW Engineering has no comments at this time.