Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-0725-00182
Parcel: 141186520

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0725-00182
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/18/2025 NPPO Standard APPROVED
08/12/2025 Commercial Plumbing Standard REQUIRES RESUBMIT ACTIVITY NO. TD-DEV-0725-00182
ADDRESS/PARCEL: (10100 E OLD VAIL RD TUCSON, AZ 85747)
COMMENTS:
1. Please show the RIM elevation of the nearest upstream manhole on the site plan. Where the finish floor elevation is less than 12 inches above the elevation of the next upstream manhole cover in the sewer, a backwater valve shall be installed (Section 714.1, IPC 2018, as amended by the City of Tucson)
08/25/2025 Entitlements Standard REQUIRES RESUBMIT Plans appear to conform to PAD-36 development standards. A letter of Approval from the Houghton Town Center Architectural Review Committee is required.
08/13/2025 Site Engineering Standard REQUIRES RESUBMIT 1. See that zoning comments are addressed.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
08/18/2025 Site Landscape Standard REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: NEW FOOD SERVICE BUILDING
ACTIVITY NO: TD-DEV-0725-00182
ADDRESS: 10100 E OLD VAIL RD
ZONING: PAD-36 HOUGHTON TOWN CENTER PAD

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape and NPPO Section review comments have been addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Can notes be added to the planting plan and the grading plan that state that all planting areas will be depressed (4-6 inches) for rainfall only catchment?

2. Provide the development package case number, TD-DEV-0725-00182, adjacent to the title block on all site landscape sheets, per Administrative Manual 2-06.4.3

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
08/11/2025 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Chipotle – Houghton Town Center
Development Package (1st Review)
TD-DEV-0725-00182

TRANSMITTAL DATE: August 11, 2025

DUE DATE: August 12, 2025

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Per UDC Article 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is July 20, 2026.

2-06.4.0 CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0725-00182, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. COMMENT: 2-06.4.7.A.6.a – Revise General Note 24 to include “UDC ARTICLE 5.6 AIRPORT ENVIRONS ZONE (AEZ)”

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

3. COMMENT: 2-06.4.9.H.5 – Clearly demonstrate that the requirements of UDC Article 7.4.6.F.2.a.(2) are met for the drive-through.

4. COMMENT: 2-06.4.9.H.5.d - Clearly demonstrate that the requirements of UDC Article 7.4.9.B.2.g are met.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
07/14/2025 CDRC Application Completeness Express REVIEW COMPLETED
07/22/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added TEP and ENT , SWG USPS, and PAG to the workflow. Review request email sent to TEP, and ENT. FYI email sent to, SWG USPS PAG.
07/22/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
07/22/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
07/29/2025 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED 4350 E. Irvington Road
Post Office Box 711, Tucson, AZ 85702
July 29, 2025
WO#T157694
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Chipotle Mexican Grill Houghton Town Center
TD-DEV-0725-00182
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 7/22/2025. There are no existing facilities within the development.There
are no TEP facilities within the project boundaries
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Cruz Vega
(520) 349-9850
cruzvega@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
07/22/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/07/2025 Fire New Construction Standard REVIEW COMPLETED
07/21/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
07/17/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
07/23/2025 ROW Engineering Review Standard REVIEW COMPLETED DTM ROW Engineering has no comments.
07/23/2025 ROW Review REVIEW COMPLETED