Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0725-00180
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/15/2025 | Site Landscape Standard | APPROVED | |||
| 08/07/2025 | Fire New Construction Standard | NOT REQUIRED | |||
| 08/15/2025 | NPPO Standard | NOT REQUIRED | |||
| 08/12/2025 | Site Engineering Standard | REQUIRES RESUBMIT | 1. Clearly delineate the limits of disturbance with labels and include the acreage of disturbance on the plans. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
| 08/11/2025 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: 2025 Lined Liquids Impoundment -COT Public Training Academy Development Package (1st Review) TD-DEV-0725-00180 TRANSMITTAL DATE: August 11, 2025 DUE DATE: August 11, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Per UDC Article 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is July 20, 2026. 2-06.3.0 FORMAT REQUIREMENTS 1. COMMENT: 2-06.3.7 - A small, project-location map shall be provided in the upper right corner of the cover sheet and meet the requirements below in comments 5-8. 2-06.4.0 CONTENT REQUIREMENTS 2. COMMENT: 2-06.4.1 – Provide an email for the engineer that prepared the plans. 3. COMMENT: 2-06.4.2.D – Provide the page number and the total number of pages in the package (i.e., sheet xx of xx) within the title block.. 4. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0725-00180, adjacent to the title block on all sheets. 5. COMMENT: 2-06.4.4 - The project-location map shall be located in the upper right corner of the cover sheet, and shall cover approximately one square mile, be drawn at a minimum scale of three inch equals one mile, and provide the following information. 6. COMMENT: 2-06.4.4.A – The location map shall show the subject property approximately centered within the one square mile area. 7. COMMENT: 2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property on the location map. 8. COMMENT: 2-06.4.4.C – Provide the section, township, and range and the scale for the location map and label the section corners on the map. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 9. COMMENT: 2-06.4.7.A.1 - List as a general note: "Existing zoning is RH." 10. COMMENT: 2-06.4.7.A.2 - List the gross area of the site/subdivision by square footage and acreage. 11. COMMENT: 2-06.4.7.A.4 – As a general note identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 12. COMMENT: 2-06.4.7.A.6.a - As Wilmont is designated as an Arterial on the COT MS&R Map provide a general note on the cover sheet stating “THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R)”. 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 13. COMMENT: 2-06.4.8.A - Provide site boundary perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 14. COMMENT: 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 07/14/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 07/22/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | EXTERNAL REVIEWERS CDRC added TEP and TAA , SWG USPS, and PAG to the workflow. Review request email sent to TEP, and TAA. FYI email sent to, SWG USPS PAG. |
||
| 08/12/2025 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 07/22/2025 | External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | FYI CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. |
||
| 07/22/2025 | External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | FYI CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. |
||
| 08/12/2025 | External Reviewers - Tucson Airport Authority Standard | REVIEW COMPLETED | August 11, 2025 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0725-00180, 1 st Submittal, Replacement of the City of Tucson Public Safety Training Academy Lined Liquids Impoundment Pond, 10001 S Wilmot Rd, Tucson, AZ. 85756, Received July 22, 2025 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0725-00180, 1 st Submittal, a development package for a replacement impoundment pond at 10001 S Wilmot Rd. This development is located in the N.W quarter of the S.W. quarter of Section 6, Township 16S, Range 15E, of the Gila and Salt River Meridian. The development site occupies parcel number 305-03-004B and is zoned as Rural Homestead (RH). The nearest major roadway intersection is East Old Vail Connection Road and South Wilmot Road, approximately 1,000 feet to the northwest of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the project and is not requiring a resubmittal of this project. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520- 573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning cc file |
||
| 08/01/2025 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | 4350 E. Irvington Road Post Office Box 711, Tucson, AZ 85702 July 29, 2025 WO#T157690 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: PSTA Pond Liner Replacement TD-DEV-0725-00180 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 7/22/2025. There are no existing facilities within the development.There does not appear to be any TEP facilities in the project area. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Cruz Vega (520) 349-9850 cruzvega@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 07/22/2025 | External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | FYI CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. |
||
| 07/21/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 07/17/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 07/23/2025 | ROW Engineering Review Standard | REVIEW COMPLETED | DTM ROW Engineering has no comments. |