Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0725-00176
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/31/2025 | NPPO Standard | NOT REQUIRED | |||
| 07/31/2025 | Site Landscape Standard | NOT REQUIRED | |||
| 08/05/2025 | Site Engineering Standard | REQUIRES RESUBMIT | 1. See zoning comments Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
| 07/29/2025 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL FROM: Bobby Parsons PDSD Zoning Review Section PROJECT: Chase Bank - Stairs, Accessible Ramp, Re-grade parking stalls Development Package (1st Review) TD-DEV-0725-00176 TRANSMITTAL DATE: 7/29/2025 DUE DATE: 7/30/2025 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is July 8, 2026. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) 2-06.3.0 FORMAT REQUIREMENTS CONTENT REQUIREMENTS 2-06.4.1 - The name, mailing and email addresses, and phone number of the primary property owner of the site, the developer of the project, registrant(s), and other person(s), firm(s), or organization(s) that prepared the development package documents shall be provided on the right half of the cover sheet. The applicable registration or license number shall be provided if prepared by or with the assistance of a registered professional, such as a surveyor, architect, landscape architect, or engineer. All sealing shall be consistent with Arizona Board of Technical Registration guidelines. 1. COMMENT: 2-06.4.1 – Please include the information as noted by the standard above. 2-06.4.2 - The title block shall include the following information and be provided on each sheet: 2-06.4.2.B - A brief legal description and a statement as to whether the project is a re-subdivision are to be provided. On re-subdivisions, provide the recording information of the existing subdivision plat; 2. COMMENT: 2-06.4.2.B – Please include a brief legal description as noted by the standard above. 2-06.4.2.D - The page number and the total number of pages in the package (i.e., sheet xx of xx). 3. COMMENT: 2-06.4.2.D – Please include the page number and the total number of pages on each sheet as noted by the standard above. 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 4. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-0725-00176, adjacent to the title block on each sheet. 2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and, 5. COMMENT: 2-06.4.4.B – Please include the information as noted by the standard above including all streets that abut the property. 2-06.4.4.C - Section, township, and range; section corners; north arrow; and the scale will be labeled. 6. COMMENT: 2-06.4.4.C – Please label the scale, section, township, and range as noted by the standard above. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. Zoning and Land Use Notes 2-06.4.7.A.1 - List as a general note: "Existing zoning is ____." 7. COMMENT: 2-06.4.7.A.1 – Please include the information as noted by the standard above. The existing zoning is C-2. 2-06.4.7.A.2 - List the gross area of the site/subdivision by square footage and acreage. 8. COMMENT: 2-06.4.7.A.2 – Please include the acreage as noted by the standard above. 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 9. COMMENT: 2-06.4.7.A.4 – Retail Banking Center is not a use classified per the UDC. Please list the use as “Financial Service: Excluding non-chartered institutions” and the associated use specific standards as noted by the standard above. 2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan. 10. COMMENT: 2-06.4.7.A.6 – Include a note stating “this project is designed to meet the overlay zone(s) criteria. UDC Article 5.4 Major Streets and Routes Setback Zone (MS&R) as noted by the standard above. 2-06.4.7.A.8 - For development package documents provide: 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 2-06.4.8.A - Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system. 11. COMMENT: 2-06.4.8.A – Please provide the site boundary perimeter information as noted by the standard above. 2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks. 12. COMMENT: 2-06.4.8.C – The following information regarding Oracle & Roger shall be provided: the name, right of way width, dimensioned width of paving, curbs, curb cuts, and sidewalks as noted by the standard above. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. If the property is being rezoned, use those boundaries and classifications. The basis for this requirement is that some zoning requirements on a project are based on the zoning classification of adjacent property. Also, in some instances, each zone has to be taken into consideration on property that is split by two or more zoning classifications, as each may have different requirements. 13. COMMENT: 2-06.4.9.F – All existing zoning classifications on and adjacent to the project (including across any adjacent right of way) shall be included on the drawing with zoning boundaries clearly defined as noted by the standard above. 2-06.4.9.H.4 - Indicate if existing streets are public or private; provide street names, widths, curbs, sidewalks, and utility locations, all fully dimensioned. 14. COMMENT: 2-06.4.9.H.4 – Please include the information as noted by the standard above. 2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC. 15. COMMENT: 2-06.4.9.H.5 – Please clearly dimension all PAALS as noted by the standard above. 2-06.4.9.J - If street dedication is not required or proposed and the project site is adjacent to a Major Street or Route, draw the Major Street right-of-way lines for those streets. (Add the MS&R future sidewalk, right-of-way lines, sight visibility triangles, etc.) 16. COMMENT: 2-06.4.9.J – Please include the information as noted by the standard above. 2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown. 17. COMMENT: 2-06.4.9.O – Please include the information as noted by the standard above. 2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s). 18. COMMENT: 2-06.4.9.Q – Please include the information as noted by the standard above. 2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual. 19. COMMENT: 2-06.4.9.R – Show on-site pedestrian circulation as noted by the standard above. 2-06.4.9.S - Show existing or proposed pedestrian circulation along abutting rights-of-way. Such sidewalks must comply with accessibility requirements for the physically disabled and the design criteria in Section 10-01.0.0, Street Technical Standards, of the Technical Standards Manual. 20. COMMENT: 2-06.4.9.S – Show existing pedestrian circulation along abutting rights of way as noted by the standard above. 2-06.4.9.T - Show refuse collection areas, including locations of dumpsters, screening location and materials, and vehicle maneuverability, fully dimensioned, and access route. If dumpster service is not proposed, indicate type of service. For specific information on refuse collection, refer to Section 8-01.0.0, Solid Waste and Recycle Disposal, Collection, and Storage, of the Technical Standards Manual. Refuse collection on all projects shall be designed based on that section, even if collection is to be contracted to a private firm. 21. COMMENT: 2-06.4.9.T – Show refuse collection areas as noted by the standard above. ***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf. |
||
| 07/03/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 07/09/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added ADOT, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to ADOT and TEP. FYI, email sent to PAG, USPS, SWG. | ||
| 07/31/2025 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 07/11/2025 | External Reviewers - Arizona Department of Transportation (ADOT) Standard | REVIEW COMPLETED | Good Afternoon, ADOT has the following comments on this DEV; The DEV is adjacent to ADOT R/W, Oracle Road, aka State Route (SR) 77. It is not anticipated that ADOT needs to be involved as it is all On-Site work, however, should the Developer, Owner and/or Contractor need to perform any work in ADOT R/W, they will need to engage ADOT and the Encroachment Permit process. Encroachment Permits | Department of Transportation [azdot.gov] |
||
| 07/09/2025 | External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 07/09/2025 | External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 08/12/2025 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | 4350 E. Irvington Road Post Office Box 711, Tucson, AZ 85702 August 12, 2025 WO#T156630 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: CHASE Roger Oracle Parking TD-DEV-0725-00176 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 7/9/2025. There are no existing facilities within the development. There are no apparent conflicts at this time. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Fred Quintero (520) 235-6329 fquintero@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 07/09/2025 | External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 07/28/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 07/08/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 07/08/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 07/10/2025 | ROW Engineering Review Standard | REVIEW COMPLETED | DTM ROW Engineering has no comments. |