Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0723-00339
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/12/2023 | Commercial Plumbing | APPROVED | |||
09/11/2023 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | September 8, 2023 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0723-00339, Change of Use - submitting for zoning comments for IPP / 844 S 6th Ave, Tucson AZ 85701, Received August 7, 2023 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0723-00339, a development plan for a change of use for an existing building at 343 S Scott Ave to support the changing of a parking plan. This development plan is located in the N.W. quarter of the S.E. quarter of Section 13, Township 14S, Range 13E, of the Gila and Salt River Meridian. The development site occupies parcel number 117-08-1070, covers approximately 0.28 ± acres, and is zoned as Commercial Zone 3 (C-3). The nearest major roadway intersection is South 6th Avenue and East 19 th Street, approximately 50 feet to the southwest of the subject development. This site is within the Tucson International Airport avigation easement requirements and public disclosure area, and FAA traffic pattern airspace. The Tucson Airport Authority approves the proposed submittal and is not requiring a resubmittal of the project. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520- 573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning |
||
09/08/2023 | ROW Engineering Review | APPROVED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
||
09/12/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
09/06/2023 | Design Review | REQUIRES RESUBMIT | Please indicate on Sheet G1.1 if exterior modifications to the structure or site are being proposed. If exterior modifications are proposed, a revised Design Package will be required. The previous Design Package was approved under Activity # T19SA00233. Proposed Food Service use may trigger IPP modification. Please consult with Mark Castro (mark.castro@tucsonaz.gov) to determine if a revised IPP will be required. Thank you. | ||
09/06/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: TD-DEV-0723-00339 844 S 6TH AV Zoning C-3 TRANSMITTAL DATE:September 6, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. 1.COMMENT: Zoning cannot approve the Development package until the individual Parking Plan (IPP) is approved. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
08/11/2023 | Zoning Modifications - IPP | REQUIRES RESUBMIT | PROJECT: 844 S 6th Ave Development Package (1st Review) TD-DEV-0723-00339 In accordance with UDC Section 7.4.5.A.7.a, the proposed change of use from office/retail space to food service triggers the requirement for a revised Individual Parking Plan (IPP). The IPP, sealed by a design professional licensed by the State of Arizona, must include the information as outlined in UDC Section 7.4.5.A.4.a – m. This project is located within 400’ of R-3 or more restrictive zones or Historic Preservation Zones and is subject to the 400’ Notice Procedure (UDC Section 3.3.5). As such, a pre-application meeting and neighborhood meeting is required prior to the submittal of an application. To request a pre-application meeting, please apply for "Pre-Application Conference" at TDC Online. If you have questions, please email Mark.Castro@tucsonaz.gov |
||
08/02/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
08/07/2023 | CDRC Review Coordinator | REVIEW COMPLETED | Added external reviewers, sent emails and sent FYI emails per SOP. | ||
08/25/2023 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | [EXTERNAL] Re: DUE SEPTEMBER 8, 2023 / Change of Use - submitting for zoning comments for IPP / TD-DEV-0723-00339 Jay Gomes <jgomes@azdot.gov> CDRC Good Afternoon, ADOT has no comments on this DEV. Thank you for the opportunity to review. |
||
08/07/2023 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
08/07/2023 | External Reviewers - Southwest Gas | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
08/07/2023 | External Reviewers - Tucson Airport Authority | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
08/07/2023 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
08/11/2023 | Fire New Construction | REVIEW COMPLETED | |||
09/05/2023 | Historic | REVIEW COMPLETED | Property is not historically designated, no Historic review required unless participating in overlay district. | ||
08/22/2023 | NPPO | REVIEW COMPLETED | |||
08/02/2023 | OK to Submit - Engineering | REVIEW COMPLETED | |||
08/02/2023 | OK to Submit - Landscape | REVIEW COMPLETED | |||
08/03/2023 | OK to Submit - Zoning | REVIEW COMPLETED | |||
09/08/2023 | Site Engineering | REVIEW COMPLETED | |||
08/22/2023 | Site Landscape | REVIEW COMPLETED |