Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0723-00339
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/01/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
10/10/2023 | Design Review | REQUIRES RESUBMIT | Second submittal dated 10/10/23 included IPP document only. Please indicate on Sheet G1.1 if exterior modifications to the structure or site are being proposed. If exterior modifications are proposed, a revised Design Package will be required. The previous Design Package was approved under Activity # T19SA00233. Proposed Food Service use has triggered the need for IPP modification that will need to be approved prior to Design approval, For IPP questions, please contact Mark Castro (mark.castro@tucsonaz.gov). For IID questions, please contact me at maria.gayosso@yahoo.com, Thank you. | ||
11/01/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: TD-DEV-0723-00339 844 S 6TH AV Zoning C-3 TRANSMITTAL DATE: October 25, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. 1.COMMENT: Zoning cannot approve the Development package until the individual Parking Plan (IPP) is approved. A revision to the last approved DP is required, Provide the new parking calculation and IPP conditions and the use and use specific standards. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
10/12/2023 | Zoning Modifications - IPP | REQUIRES RESUBMIT | The IPP application has been received. Staff will process the application in accordance with UDC Section 3.3.5 400' Notice Procedure. If you have any questions, please contact Mark.Castro@tucsonaz.gov | ||
10/10/2023 | CDRC Application Completeness | REVIEW COMPLETED |