Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW REVISION v.1
Permit Number - TD-DEV-0723-00325
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/17/2025 | Site Engineering Standard | APPROVED | |||
| 06/09/2025 | Site Landscape Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: REVISION 3 - RESTRICTED ACCESS - CONSTRUCTION OF A +/-53,802 SF, 3 STORY, REHABILITATION HOSPITAL ACTIVITY NO: TD-DEV-0723-00325 ADDRESS: 820 E TUCSON MARKETPLACE BL ZONING: PAD-15 (THE BRIDGES PAD) This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape and NPPO Section review comments have been addressed. SITE LANDSCAPE/NPPO SECTION COMMENTS: 1. Update the alignment of the PVC irrigation sleeve for the asphalt parking area crossing between landscape areas (south end of center isle) on sheet L-200. Thank you. Chad Keller, RLA Landscape Architect chad.keller@tucsonaz.gov 520.837.4923 |
||
| 06/10/2025 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Nobis Rehab Partners Development Package (1st Review, 2nd Revision) TD-DEV-0723-00325 TRANSMITTAL DATE: June 10, 2025 DUE DATE: June 9, 2025 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is July 30, 2024. CONTENT REQUIREMENTS 2-06.4.7.A.8 - For development package documents provide: 1. COMMENT: 2-06.4.7.A.8.d – Provide an updated Bridges Tracking Table on the DP. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 05/16/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 05/29/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | NO EXTERNAL REVIEWERS External Reviewers not required. No further action is required from the customer at this time. |
||
| 05/28/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 05/27/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED |