Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-0723-00307
Parcel: 14044248B

Address:
7330 S WILMOT RD

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0723-00307
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/23/2023 Commercial Plumbing APPROVED
08/14/2023 External Reviewers - Tucson Airport Authority APPROVED August 13, 2023
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-0723-00307, For clearing and grubbing of temporary construction laydown yard for
Encantada La Estancia Apartments / 7330 S Wilmot, Tucson, AZ 85756, Received July 24,
2023
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-0723-00307, the development plan for
establishing a temporary construction yard for the future construction of an apartment complex
at 7330 S Wilmot Rd. This development is located in the N.E. quarter of the N.E. quarter of
Section 24, Township 15S, Range 15E, of the Gila and Salt River Meridian. The development
site occupies parcel number 140-44-248B, covers approximately 3.9 ± acres, and is zoned as
Commercial Zone 2 (C-2). The nearest major roadway intersection is East Los Reales Road
and South Wilmot Road, approximately 50 feet to the northeast of the subject development.
This site does lie within the Tucson International Airport avigation easement requirements and
public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
The Tucson Airport Authority approves the proposed project and is not requiring a resubmittal.
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
07/25/2023 Site Zoning APPROVED
08/11/2023 Traffic Engineering Review APPROVED
07/20/2023 Site Landscape NOT REQUIRED
08/23/2023 CDRC Post Review Express PENDING ASSIGNMENT
07/20/2023 NPPO REQUIRES RESUBMIT There are native plants on the site, therefore the exception is not approved. Please submit an NPPO. Additionally, include plans/information for dust control/soil stabilization after use is completed.
07/28/2023 Site Engineering REQUIRES RESUBMIT 1. Provide grading cut and fill quantities.

Lianne Evans
lianne.evans@tucsonaz.gov
07/14/2023 CDRC Application Completeness Express REVIEW COMPLETED
07/20/2023 CDRC Review Coordinator Express REVIEW COMPLETED Added external reviewers, sent emails and sent FYI emails per SOP.
07/25/2023 External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED Good Afternoon,

Thank you for providing this DEV for our review.

ADOT has one comment;
Considering the proximity to Interstate 10, should Traffic Control be necessary for any operations associated with the site, it should be known that any devices needed to be ADOT right of way will require an Encroachment Permit. If necessary, please send permit applications to southcentralpermit@azdot.gov.
07/20/2023 External Reviewers - Pima Association of Governments REVIEW COMPLETED Sent FYI emails per SOP.
07/20/2023 External Reviewers - Southwest Gas REVIEW COMPLETED Sent FYI emails per SOP.
07/20/2023 External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Sent FYI emails per SOP.
07/20/2023 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED Sent FYI emails per SOP.
08/03/2023 Fire New Construction REVIEW COMPLETED
07/14/2023 OK to Submit - Engineering Fast REVIEW COMPLETED
07/17/2023 OK to Submit - Landscape Fast REVIEW COMPLETED
07/20/2023 OK to Submit - Zoning Fast REVIEW COMPLETED