Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0723-00300
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/24/2023 | Site Engineering | APPROVED | |||
| 07/21/2023 | Site Zoning | APPROVED | |||
| 08/09/2023 | Traffic Engineering Review | APPROVED | |||
| 07/11/2023 | Site Landscape | NOT REQUIRED | |||
| 08/25/2023 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 08/17/2023 | Commercial Plumbing | REQUIRES RESUBMIT | The vertical distance between the water service and highest water outlet in the building appears to be greater than 34 feet. Reduced pressure backflow prevention assemblies are required at the water meter for buildings that have three or more stories or are greater than 34-feet in height as measured from the service level. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, https://www.tucsonaz.gov/files/sharedassets/public/city-services/tucson-water/water-quality/documents/backflow-ordinance.pdf | ||
| 07/11/2023 | NPPO | REQUIRES RESUBMIT | Outside of the set-aside area, all saguaros must be inventoried by the appropriate professional. Mitigation calculations are required. UDC 7.7.5.3 | ||
| 07/10/2023 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 07/11/2023 | CDRC Review Coordinator Express | REVIEW COMPLETED | Added external reviewer, sent emails and sent FYI emails per SOP. | ||
| 08/25/2023 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | [EXTERNAL] Re: DUE AUGUST 16, 2023 / Grading for a single family residence. / TD-DEV-0723-00300 Jay Gomes <jgomes@azdot.gov> CDRC Good Afternoon, ADOT has no comments on this DEV. Thank you for the opportunity to review. |
||
| 07/11/2023 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 07/11/2023 | External Reviewers - Southwest Gas | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 07/11/2023 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 07/11/2023 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 07/27/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 07/10/2023 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 07/10/2023 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
| 07/10/2023 | OK to Submit - Zoning Fast | REVIEW COMPLETED |