Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0723-00295
Parcel: 12501022A

Address:
2555 E 1ST ST

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0723-00295
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/10/2023 NPPO APPROVED
08/15/2023 Site Engineering APPROVED
08/10/2023 Site Landscape APPROVED
08/16/2023 CDRC Post Review Express PENDING ASSIGNMENT
08/16/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: The Edge School PV System
Development Package (1st Review)
TD-DEV-0723-00295

TRANSMITTAL DATE: August 15, 2023

DUE DATE: September 6, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is August 7, 2024.

CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0723-00295, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. COMMENT: 2-06.4.7.A.2 - List the gross area of the site/subdivision by square footage and acreage.

3. COMMENT: 2-06.4.7.A.4 – The existing use shown under Zoning Data is not correct and should be listed as Educational Use: Elementary and Secondary, subject to Use Specific Standards 4.9.3.D.1 – 7.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

4. COMMENT: 2-06.4.9.F – The adjacent zoning listed to the north is not correct and should be C-1.

5. COMMENT: 2-06.4.9.O – Per UDC TABLE 6.3-4.A: DIMENSIONAL STANDARDS FOR THE C-1, C-2, C-3, OCR-1, & OCR-2 ZONES, C-3 Zone, Nonres to Res Zone, the required perimeter yard setback to the west property line is 1 ½ (H) = Height of the proposed exterior building wall. Perimeter yard setbacks are based on a measurement from design grade to the highest point of the exterior wall UDC Article 6.4.5.B & Figure 6.4.5-A. As a height dimension to the highest point of the shade structure was not provided Zoning cannot determine the required perimeter yard but based on the 16’-4” dimension shown on the Array Profile the required setback at that location would be 24’-6” to the west property line, proposed setback is 12’-4”. A Design Development Option (DDO) must be submitted and approved to reduce the required setback. DDO application and requirements can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration. If you have questions about the DDO application or process please contact Wyatt Berger at Wyatt.Berger@tucsonaz.gov or Georgia Pennington at Georgia.Pennington@tucsonaz.gov.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter.
08/07/2023 CDRC Application Completeness Express REVIEW COMPLETED
08/08/2023 CDRC Review Coordinator Express REVIEW COMPLETED No external reviewers nor added.
08/11/2023 Fire New Construction REVIEW COMPLETED
08/08/2023 OK to Submit - Landscape Fast REVIEW COMPLETED