| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/28/2026 | External Reviewers - COT Environmental Services Standard | APPROVED | |||
| 10/20/2026 | Site Engineering Standard | APPROVED | |||
| 10/26/2026 | Design Review Standard | REQUIRES RESUBMIT | Awaiting for resubmital of revised RNA Design Package. | ||
| 11/02/2026 | Fire New Construction Standard | REQUIRES RESUBMIT | -Please see previous comments. Provide a response to each comment. -In regard to the aerial access, obstructions cannot be located in the area designated as aerial access. This includes trees with a mature height over 20'. john.vincent@tucsonaz.gov 5203495581 |
||
| 10/30/2026 | Site Landscape Standard | REQUIRES RESUBMIT | PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, PLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: MOXY HOTEL DEVELOPMENT PACKAGE ACTIVITY NO: TD-DEV-0626-00166 ADDRESS: 45 N 5TH AV ZONING: OFFICE/COMMERCIAL/RESIDENTIAL ZONE (OCR-2); RIO NUEVO AREA; INFILL INCENTIVE DISTRICT LAND USE: COMMERCIAL HOTEL REVIEW NO: 2 10.30.2026 THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING, PER-THE-CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM). RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED. SITE LANDSCAPE/NPPO SECTION COMMENTS: 1. DTM review has identified items that require clarification and likely revisions to the overall plan set. Please adjust plans to satisfy their comments. These changes are also subject to Design Review Standard resubmittal for RNA approval. 2. A simple shade study with hatches to differentiate the sidewalk and the shade provided by the canopy trees and shade provided by the building would be helpful for visualization. 3. Include a detail for the typical foundation/wall planters at the edge of the building. Will the planters be placed on concrete adjacent to the building without some kind of anchor, or will they be a medium gauge weathering steel (Corten) and heavy enough to not require extra attachment to a fixed surface on site? The irrigation details 10 and 11 include a raised tree planter detail which is great. A similar detail with callouts to attachments and materials and drip irrigation will be great for clarity during review and installation. 4. Update the details sheet to only include the needed details. There are no plantings on slopes or saguaro or ocotillo on the proposed plans. Thank you. CHAD KELLER - PLA LANDSCAPE ARCHITECT CITY OF TUCSON - PDSD CHAD.KELLER@TUCSONAZ.GOV 520.837.4923 |
||
| 10/26/2026 | Site Zoning Standard | REQUIRES RESUBMIT | 1. No new substantive comments are provided. Final Site Zoning approval cannot be granted until the associated Special Districts application, SD-0826-00116, is first approved. Contact Fernando Garcia, Lead Planner, Site Zoning at fernando.garcia2@tucsonaz.gov. |
||
| 10/23/2026 | Transportation Maps and Records Review - Standard | REQUIRES RESUBMIT | Please see comments on added plans under attachments. Thanks. | ||
| 10/26/2026 | External Reviewers - Arizona Department of Transportation (ADOT) Standard | REVIEW COMPLETED | ADOT has no comments. Thanks, Rick Freije |
||
| 10/28/2026 | ROW Engineering Review Standard | REVIEW COMPLETED | See DTM Comment file in attachments. Additional meeting required for ROW impact coordination in a Major Impact Traffic Zone. Items to discuss include, Temporary Traffic Control Plans to address lane restrictions, temporary ADA routes, bus route, and business access. |
||
| 11/02/2026 | Transportation Landscape Review Standard | REVIEW COMPLETED | Landscape comments that were discussed in meetings need to be addressed before approval | ||
| 10/14/2026 | TSMR/PDMR - Engineering | REVIEW COMPLETED | |||
| 10/20/2026 | TSMR/PDMR - Zoning | REVIEW COMPLETED |