Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0626-00162
Parcel: 11103184B

Address:
3305 N CARDI BL

Review Status: In Review

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0626-00162
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
N/A Commercial Plumbing Standard PENDING ASSIGNMENT
N/A NPPO Standard PENDING ASSIGNMENT
N/A Site Landscape Standard PENDING ASSIGNMENT
N/A Site Zoning Standard PENDING ASSIGNMENT
07/09/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0626-00162 (1st Review)
Project: Change of use. There will be a minor TI submitted once this is approved.
Location: 3305 N CARDI BL
Review Date: 7/9/2026
Reviewer: Marco Contreras – Engineering Associate & Joe Macaulay – Civil Engineer
Reviewer Contact Information: marco.contreras@tucsonaz.gov & Joe.Macaulay@tucsonaz.gov
Related cases:

Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.
The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Review Comments:
1. Provide the development package case number (TD-DEV-0626-00162) adjacent to the title block on each sheet of the plan set. [AM 2-06.3.3]
2. Provide the Zoning and Land Use General Note: “Any relocation or modification of existing utilities and/or public improvements necessitated by the proposed development will be at no expense to the public.” [AM 2-06.4.7.D]
3. Provide the general note: “Any Proposed signs will be approved per separate permit” [AM 2-06.4.7]
4. Provide the page number and total number of pages within the Development Package plan set (i.e., sheet xx of xx) on the bottom right corner of each page. [AM 2-06.4.2.D]
5. Site plan (a100) - Revise the site plan provided to provide Sight visibility triangles for all site entrances: Country Club RD is designated as an Arterial Road. This designation will be used for Table 5.3. Refer to TSM 10-01.9.0 Figures 16-18 for examples of SVTs. [TSM 10-01.5.0.]
a. Confirm that no proposed structures, walls, signs, landscaping, or other vertical elements exceeding the allowable height limit encroach within the established SVT at any site access point. Where conflicts exist, the site design must be revised to achieve full compliance.
6. Revision will be required – Access lanes and PAALs must be setback at least two-feet from a wall over six inches. [UDC7.4.6.F.2.b]
7. Dimension all pathways – Ensure compliance with minimum 4-ft clearance requirements [TSM 7-01.3.3 & 7-01.4.3.A]
8. Provide a construction detail or PAG reference for proposed wheel stops.

Waste Management Comments:
9. The plans do not demonstrate compliance with TSM 8-01.5.1.A, which requires that adequate space be provided for both solid waste and recycling collection services. Revise the plans to clearly show that each proposed APC provides designated separate space for solid waste containers and recycling containers.
06/29/2026 CDRC Application Completeness Express REVIEW COMPLETED
07/08/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
07/26/2026 Fire New Construction Standard REVIEW COMPLETED
06/30/2026 OK to Submit - Engineering Fast REVIEW COMPLETED
07/02/2026 OK to Submit - Zoning Fast REVIEW COMPLETED
07/24/2026 ROW Engineering Review Standard REVIEW COMPLETED
07/10/2026 ROW Review REVIEW COMPLETED