Permit Number: TD-DEV-0626-00158
Parcel: 13506136H

Address:
2550 S KOLB RD

Review Status: In Review

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0626-00158
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
N/A Commercial Plumbing Standard PENDING ASSIGNMENT
N/A Fire New Construction Standard PENDING ASSIGNMENT
N/A NPPO Standard PENDING ASSIGNMENT
N/A ROW Engineering Review Standard PENDING ASSIGNMENT
N/A Site Landscape Standard PENDING ASSIGNMENT
N/A Site Zoning Standard PENDING ASSIGNMENT
07/21/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0626-00158 (1st Review)
Project: 2 EV Level 3 Charging Stations to be installed at the exiting Walmart Neighborhood Market.
Location: 2550 S KOLB RD
Review Date: 7/21/2026
Reviewer: Marco Contreras – Engineering Associate & Joe Macaulay – Civil Engineer
Reviewer Contact Information: marco.contreras@tucsonaz.gov
Related cases:

Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.
The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Review Comments:
1. Provide the development package case number (TD-DEV-0626-00158) adjacent to the title block on each sheet of the plan set. [AM 2-06.3.3]
2. Provide the page number and total number of pages within the Development Package plan set (i.e., sheet xx of xx) on the bottom right corner of each page. [AM 2-06.4.2.D]
3. Provide the Zoning and Land Use General Note: “Any relocation or modification of existing utilities and/or public improvements necessitated by the proposed development will be at no expense to the public.” [AM 2-06.4.7.D]
4. Provide the Zoning and Land Use General Note: “No structure or vegetation shall be located or maintained so as to interfere with the sight visibility triangles in accordance with Section 10-01.5.0, Sight Visibility, of the Technical Standards Manual.” [AM 2-06.4.7.C.2]
5. Provide the general note: “Any Proposed signs will be approved per separate permit” [AM 2-06.4.7]
6. Provide the Zoning and Land Use General Note: “Drainage will remain in its natural state and will not be altered, disturbed, or obstructed other than as shown on this site plan.” [AM 2-06.4.7.B.3]
7. Provide the Zoning and Land Use General note: “The developer, any successors and assigns, will hold the City of Tucson, its officers, employees, and agents harmless from any and all claims for damages related to the use of this development as shown hereon, now and in the future, by reason of flooding, flowage, erosion, or damage caused by water, whether surface flood or rainfall.” [AM 2-06.4.7.B.1]
8. Denote on the site plan (C3.0) the proposed angle of the parking spaces shown.
9. Clarification required – at the point where the crosswalk from the West/NW connects to the new EV Charging area, are the spaces directly north of keynotes #9 intended to be parallel parking spaces?
a. If they are intended to be spaces, revision will be required to ensure the space(s) can be 18-ft in length minimum and be sufficiently marked to demonstrate their use as spaces. It would also be necessary that the stripped pathway shown be moved inward towards the center of the aisle and not be in between the parking space and PAAL. As currently presented, it appears unlikely a car could enter both spaces effectively while maintaining pathway clearance and avoiding potential conflicts with bollards and other parked vehicles. [UDC 7.4.6.D.2.c]
10. Revise the plans so that accessible proposed EV Charging station is protected by a bollard at each corner for a total of 4 bollards.
07/20/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC Added TEP, SWG, PAG, USPS, and Addressing. FYI sent to TEP, SWG, PAG, and USPS
07/20/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
07/21/2026 External Reviewers - Pima County Addressing Standard REVIEW COMPLETED Good morning,

Pima County Addressing approves TD-DEV-0626-00158. Please be aware that once our invoice is paid (P26AD00563) the address for the project will be 2568 S Kolb Rd.


Thank you,







David Wilging

Planner I - Addressing Division

Pima County Development Services

201 N. Stone Avenue 1st Floor

Tucson, Arizona 85701

520-724-6381
07/20/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
07/20/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
07/20/2026 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
07/20/2026 OK to Submit - Zoning Fast REVIEW COMPLETED