Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0626-00147
Parcel: 12620001C

Address:
800 S CONCERT PL

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0626-00147
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/01/2026 NPPO Standard APPROVED
07/01/2026 Site Landscape Standard APPROVED
06/18/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0626-00147 (1st Review)
Project: Renovation of the existing Demeester Performance Center, includes interior renovation, Bandshell modifications, audience seating area improvements, accessibility improvements, and Theatrical Sound and Lighting upgrades
Location: 800 S CONCERT PL
Review Date: 6/18/2026
Reviewer: Marco Contreras – Engineering Associate
Reviewer Contact Information: marco.contreras@tucsonaz.gov
Related cases:

Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.
The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Review Comments:
1. Provide the development package case number (TD-DEV-0626-00147) adjacent to the title block on each sheet of the plan set. [AM 2-06.3.3]
2. Revise the cover sheet to include the name, registration number, seal, and contact information for the Geotechnical Engineer of Record, along with the name and address of the geotechnical firm. This information shall be presented with the other project registrant contact information on the cover sheet. [AM 2-06.4.1]
3. Provide the general note: Accessible standards to be met per 2024 IBC, chapter 11, and 2017 ICC A117.1
4. Revise the description under the cover sheet location map to state City of Tucson rather than COT.
5. Dimension the widths of the proposed sidewalks on the site plan (Sheet 2) [TSM 7-01.4.3]
07/06/2026 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM:
Bobby Parsons
PDSD Zoning Review Section

PROJECT:
Renovation of Demeester Performance Center – 800 S. Concert Pl. Tucson, AZ 85716
Development Package (1st Review)
TD-DEV-0626-00147

TRANSMITTAL DATE: 7/6/2026
DUE DATE: 7/7/2026

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June 11, 2027.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

CONTENT REQUIREMENTS

2-06.4.1 - The name, mailing and email addresses, and phone number of the primary property owner of the site, the developer of the project, registrant(s), and other person(s), firm(s), or organization(s) that prepared the development package documents shall be provided on the right half of the cover sheet. The applicable registration or license number shall be provided if prepared by or with the assistance of a registered professional, such as a surveyor, architect, landscape architect, or engineer. All sealing shall be consistent with Arizona Board of Technical Registration guidelines.

1. COMMENT: 2-06.4.1 – Please include the contact information for the Geotechnical engineering consultants as noted by the standard above.

2-06.4.2 - The title block shall include the following information and be provided on each sheet:

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

2. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-0626-00147, adjacent to the title block on each sheet.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

Zoning and Land Use Notes

2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

3. COMMENT: 2-06.4.7.A.4 – Please include the Use Specific Standards associated with Parks and Recreation use in the R-1 zone as noted by the standard above. Per UDC Table 4.8-2, the Use Specific Standards are 4.9.13.B & C.

2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan.

4. COMMENT: 2-06.4.7.A.6 – Please include a note stating “this project is designed to meet the overlay zone(s) criteria. UDC Article 5.6 Airport Environs Zone (AEZ).

***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations ***

If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
06/10/2026 CDRC Application Completeness Express REVIEW COMPLETED
06/15/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added Parks & Rec, Addressing, ADOT, TAA, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to Addressing and ADOT.  FYI email sent to Parks & Rec, TAA, TEP, PAG, USPS, SWG.
07/07/2026 Commercial Plumbing Standard REVIEW COMPLETED
07/08/2026 External Reviewers - Arizona Department of Transportation (ADOT) Standard REVIEW COMPLETED ​CDRC​
ADOT has no comments.

Thanks, Rick Freije
06/15/2026 External Reviewers - COT Parks & Recreation Standard REVIEW COMPLETED CDRC sent FYI email sent to Parks & Rec, TAA, TEP, PAG, USPS, SWG. No further action is required.
06/15/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to TAA, TEP, PAG, USPS, SWG. No further action is required.
06/16/2026 External Reviewers - Pima County Addressing Standard REVIEW COMPLETED Good afternoon,

TD-DEV-0626-00147 does not require review from Pima County Addressing.


Thank you,







David Wilging

Planner I - Addressing Division

Pima County Development Services

201 N. Stone Avenue 1st Floor

Tucson, Arizona 85701

520-724-6381
06/15/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to TAA, TEP, PAG, USPS, SWG. No further action is required.
06/15/2026 External Reviewers - Tucson Airport Authority Standard REVIEW COMPLETED CDRC sent FYI email sent to TAA, TEP, PAG, USPS, SWG. No further action is required.
07/15/2026 External Reviewers - Tucson Airport Authority Standard REVIEW COMPLETED uly 9, 2026
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-0626-00147, 1st Submittal, Georges DeMeester Performance Center Renovation,
800 S. Concert Pl, Tucson, AZ. 85716, Received June 16, 2026
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-0626-00147, 1st Submittal, a
development plan for the renovation of an existing performance center at 800 S Concert Place.
This development is located in the S.W. quarter of the S.W. quarter of Section 16, Township
14S, Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel
number 126-20-001C, covers approximately 3.2 ± acres, and is zoned as Residence 1 Zone (R1). The nearest major roadway intersection is East Camino Campestre and South Country Club
Road, approximately 1,100 feet to the northwest of the subject development.
The Tucson Airport Authority does not object to the first submittal of this project and is not
requiring a resubmittal.
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
06/15/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED CDRC sent FYI email sent to TAA, TEP, PAG, USPS, SWG. No further action is required.
06/15/2026 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to TAA, TEP, PAG, USPS, SWG. No further action is required.
06/21/2026 Fire New Construction Standard REVIEW COMPLETED
06/11/2026 OK to Submit - Engineering Fast REVIEW COMPLETED
06/11/2026 OK to Submit - Zoning Fast REVIEW COMPLETED
07/14/2026 ROW Engineering Review Standard REVIEW COMPLETED
06/15/2026 ROW Review REVIEW COMPLETED