Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0626-00145
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/10/2026 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 06/10/2026 | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| 06/10/2026 | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| 06/10/2026 | NPPO Standard | PENDING ASSIGNMENT | |||
| 06/10/2026 | ROW Engineering Review Standard | PENDING ASSIGNMENT | |||
| 06/10/2026 | Site Engineering Standard | PENDING ASSIGNMENT | |||
| 06/10/2026 | Site Landscape Standard | PENDING ASSIGNMENT | |||
| 06/10/2026 | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 06/09/2026 | OK to Submit - Engineering Fast | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-0626-00145 (OK To Submit Review) Project: Proposed industrial building with associated access, parking, landscape and stormwater harvesting Location: 144 W LESTER ST Review Date: 6/9/2026 Reviewer: Marco Contreras – Engineering Associate Reviewer Contact Information: marco.contreras@tucsonaz.gov Related cases: Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards. The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files. Applicable Code Links for quick/direct reference: City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering Review Comments: 1. After completing the initial completeness review, it was determined that the application is incomplete and cannot be accepted for full review. The following item(s) must be submitted prior to application acceptance: a. Geotechnical Report – A site-specific geotechnical investigation report prepared by a licensed geotechnical engineer is required [IBC 1803]. The report shall address soil bearing capacity, site classifications, expansive soils, groundwater conditions, and any recommendations for foundation design as applicable to the proposed construction. Please resubmit the application with the required document at your earliest convenience. Once all required materials are received, a new completeness review will be conducted, and your application will be formally accepted and routed for full technical review by all assigned reviewers. |
||
| 06/10/2026 | OK to Submit - Zoning Fast | REQUIRES RESUBMIT | 1. Address Site Engineering comment. Loran Shamis loran.shamis@tucsonaz.gov |
||
| 06/08/2026 | CDRC Application Completeness Express | REVIEW COMPLETED |