Permit Number: TD-DEV-0626-00144
Parcel: 125101480

Review Status: In Review

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0626-00144
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
07/13/2026 Design Review Standard NOT REQUIRED Not in a Special District.
N/A Commercial Plumbing Standard PENDING ASSIGNMENT
N/A NPPO Standard PENDING ASSIGNMENT
N/A ROW Engineering Review Standard PENDING ASSIGNMENT
N/A Site Landscape Standard PENDING ASSIGNMENT
N/A Site Zoning Standard PENDING ASSIGNMENT
07/08/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0626-00144 (1st Review)
Project: Installing 4 EV DCFC chargers to the existing WM parking lot, for a total of 8 EV stalls. Also proposing the addition of a switchboard and utility transformer to service the chargers, along with regrading and modifications to the existing landscaping.
Location: 3435 E BROADWAY BL
Review Date: 7/8/2026
Reviewer: Marco Contreras – Engineering Associate & Joe Macaulay – Civil Engineer
Reviewer Contact Information: marco.contreras@tucsonaz.gov & Joe.Macaulay@tucsonaz.gov
Related cases:

Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.
The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Review Comments:
1. Provide the development package case number (TD-DEV-0626-00144) adjacent to the title block on each sheet of the plan set. [AM 2-06.3.3]
2. Provide the page number and total number of pages within the Development Package plan set (i.e., sheet xx of xx) on the bottom right corner of each page. [AM 2-06.4.2.D]
3. Provide the Zoning and Land Use General Note: “Any relocation or modification of existing utilities and/or public improvements necessitated by the proposed development will be at no expense to the public.” [AM 2-06.4.7.D]
4. Provide the Zoning and Land Use General Note: “No structure or vegetation shall be located or maintained so as to interfere with the sight visibility triangles in accordance with Section 10-01.5.0, Sight Visibility, of the Technical Standards Manual.” [AM 2-06.4.7.C.2]
5. Provide the general note: “Any Proposed signs will be approved per separate permit” [AM 2-06.4.7]
6. Provide the Zoning and Land Use General Note: “Drainage will remain in its natural state and will not be altered, disturbed, or obstructed other than as shown on this site plan.” [AM 2-06.4.7.B.3]
7. Provide the Zoning and Land Use General note: “The developer, any successors and assigns, will hold the City of Tucson, its officers, employees, and agents harmless from any and all claims for damages related to the use of this development as shown hereon, now and in the future, by reason of flooding, flowage, erosion, or damage caused by water, whether surface flood or rainfall.” [AM 2-06.4.7.B.1]
8. The Western most proposed curbing radii will be required to be revised to be the minimum unobstructed radius of 5-ft. [UDC 7.4.6.E.1.a]
9. Clarification required – at the point where the crosswalk from the East connects to the new EV Charging area, is the space by keynote #2 intended to be parallel parking spaces?
a. If they are intended to be spaces, revision will be required to ensure the space(s) can be 18-ft in length and be sufficiently marked to demonstrate their use as spaces. It would also be necessary that the stripped pathway shown be moved inward towards the center of the aisle and not be in between the parking space and PAAL. As currently presented, it appears unlikely a car could enter both spaces effectively while maintaining pathway clearance and avoiding potential conflicts with bollards and other parked vehicles. [UDC 7.4.6.D.2.c]
07/02/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added Addressing, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to Addressing.  FYI email sent to TEP, PAG, USPS, SWG.
07/02/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
07/08/2026 External Reviewers - Pima County Addressing Standard REVIEW COMPLETED Good morning,

Pima County Addressing approves TD-DEV-0626-00144. An addressing record has been created for this project. Once paid, the address for this project moving forward will be 3431 E Broadway Bl.

Thank you,







David Wilging

Planner I - Addressing Division

Pima County Development Services

201 N. Stone Avenue 1st Floor

Tucson, Arizona 85701

520-724-6381
07/02/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
07/02/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
07/02/2026 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
07/21/2026 Fire New Construction Standard REVIEW COMPLETED
06/30/2026 OK to Submit - Zoning Fast REVIEW COMPLETED