Permit Number: TD-DEV-0626-00142
Parcel: 14118530B

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0626-00142
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/29/2026 NPPO Standard NOT REQUIRED
06/29/2026 Site Landscape Standard NOT REQUIRED
06/21/2026 Fire New Construction Standard REQUIRES RESUBMIT -New barrier gate operator needs to provide fire dept access by adding knox key switch. Add notes to drawings.
john.vincent@tucsonaz.gov
5203495581
06/11/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0626-00142 (1st Review)
Project Minor DP for parking and shade structure
Location: 9538 E OLD VAIL RD
Review Date: 6/11/2026
Reviewer: Marco Contreras – Engineering Associate
Reviewer Contact Information: marco.contreras@tucsonaz.gov
Related cases:

Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.
The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Review Comments:
1. Provide the development package case number (TD-DEV-0626-00142) adjacent to the title block on each sheet of the plan set. [AM 2-06.3.3]
2. Revise General Note #14 - Accessible standards must be met per 2024 IBC, chapter 11, and 2017 ICC A117.1 – not 2009
3. Denote the height of the shade canopy structure on the plan set.
4. Denote the width of the newly proposed sidewalk (Minimum must be 4-ft)
06/12/2026 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Jeffrey W. Cassidy, Planner
Planning & Development Services Department – Current Zoning Review Section

PROJECT: TD-DEV-0626-00142 – Commercial – Minor DP for parking and shade structure
9538 E OLD VAIL RD TUCSON, AZ 85747 (I-2 Zoning)
Commercial Site Plan Review – 1st Review

TRANSMITTAL DATE: June 12, 2026

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-8753

This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above.

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June, 04, 2027.

1. COMMENT: UPDATE TD-DEV # IN TITLEBLOCK TO TD-DEV-0626-00142.

2. COMMENT: ADD PERMIT REFERENCE NUMBERS DP20-0242 AND T21CM00886.

3. COMMENT: REFER TO SITE ENGINEERING REVIEW COMMENTS FOR ADDITIONAL ITEMS TO ADDRESS.

4. COMMENT: ADDITIONAL COMMENTS MAY BE FORTHCOMING ON THE NEXT REVIEW BASED ON RESPONSES TO ZONING AND OTHER THE PDSD REVIEWER COMMENTS.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:
1. Corrected building permit
2. Provide a detailed response letter with your submittal that clearly shows how you have addressed all Zoning comments.

To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home .

Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/old-pdfs/double-old/resubmittals.pdf

If you have any questions about this transmittal, please contact jeffrey.cassidy@tucsonaz.gov

The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code .
06/11/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added Addressing, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to Addressing nad ADOT.  FYI email sent to TEP, PAG, USPS, SWG.
07/02/2026 Commercial Plumbing Standard REVIEW COMPLETED No plumbing or utility work proposed.
06/11/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
06/15/2026 External Reviewers - Pima County Addressing Standard REVIEW COMPLETED Good afternoon,

TD-DEV-0626-00142 does not require review from Pima County Addressing.


Thank you,







David Wilging

Planner I - Addressing Division

Pima County Development Services

201 N. Stone Avenue 1st Floor

Tucson, Arizona 85701

520-724-6381
06/11/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
07/08/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED FYI Sent to TEP
06/11/2026 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
06/11/2026 OK to Submit - Zoning Fast REVIEW COMPLETED
07/07/2026 ROW Engineering Review Standard REVIEW COMPLETED No impact to ROW