Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0626-00141
Parcel: 10714376C

Address:
555 E GRANT RD

Review Status: In Review

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0626-00141
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
06/21/2026 Fire New Construction Standard NOT REQUIRED
06/29/2026 Historic NOT REQUIRED
06/29/2026 NPPO Standard NOT REQUIRED
N/A Commercial Plumbing Standard PENDING ASSIGNMENT
N/A External Reviewers - Arizona Department of Transportation (ADOT) Standard PENDING ASSIGNMENT
N/A ROW Engineering Review Standard PENDING ASSIGNMENT
06/11/2026 External Reviewers - United States Postal Service (USPS) Standard REQUIRES RESUBMIT CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
06/11/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0626-00141 (1st Review)
Project: INSTALL (1) PRE-ASSEMBLED SUPERCHARGER UNITS - (1 TOTAL) SUPERCHARGER CABINETS - (8 TOTAL) SUPERCHARGER POSTS - (1) TESLA SITE CONTROLLER INSTALL (1) SWITCHBOARD ASSEMBLY WITH INTEGRATED TESLA SITE CONTROLLER AND PRIMARY BROADCAST UNIT · INSTALL (1) UTILITY TRANSFORMER, (1) METER, AND OTHER ASSOCIATED UTILITY EQUIPMENT · INSTALL (2) POLE MOUNTED LUMINAIRES · FUTURE (1) SUPERCHARGER CABINETS · FUTURE (8) SUPERCHARGER POSTS
Location: 555 E GRANT RD
Review Date: 6/11/2026
Reviewer: Marco Contreras – Engineering Associate
Reviewer Contact Information: marco.contreras@tucsonaz.gov
Related cases:

Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.
The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Review Comments:
1. Provide the development package case number (TD-DEV-0626-00141) adjacent to the title block on each sheet of the plan set. [AM 2-06.3.3]
2. Provide the Zoning and Land Use General note: “The developer, any successors and assigns, will hold the City of Tucson, its officers, employees, and agents harmless from any and all claims for damages related to the use of this development as shown hereon, now and in the future, by reason of flooding, flowage, erosion, or damage caused by water, whether surface flood or rainfall.” [AM 2-06.4.7.B.1]
3. Provide the Zoning and Land Use General Note: “Any relocation or modification of existing utilities and/or public improvements necessitated by the proposed development will be at no expense to the public.” [AM 2-06.4.7.D]
4. Provide the Zoning and Land Use General Note: “No structure or vegetation shall be located or maintained so as to interfere with the sight visibility triangles in accordance with Section 10-01.5.0, Sight Visibility, of the Technical Standards Manual.” [AM 2-06.4.7.C.2]
5. Provide the general note: “Any Proposed signs will be approved per separate permit”
6. Provide the page number and total number of pages within the DP (i.e., sheet xx of xx) on the bottom right corner of each page. [AM 2-06.4.2.D]
7. Wheel Stops will be required at all newly proposed electric vehicle (EV) parking spaces. These are required to prevent the possibility of vehicle impact. [UDC 7.4.6.H]
a. When wheel stops are provided within parking spaces, the wheel stop must be placed a minimum of 2.5 feet from the front of the parking stall — measured from the front stall line to the back face of the wheel stop.
b. Ensure to provide a construction detail or PAG\applicable reference.
8. Revise the site plan (Sheet C-111) to provide Sight visibility triangles for the site entrance. NOTE: Grant RD is designated as an Arterial Road. This designation will be used for Table 5.3. Refer to TSM 10-01.9.0 Figures 16-18 for examples of SVTs. [TSM 10-01.5.0.]
06/29/2026 Site Landscape Standard REQUIRES RESUBMIT PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, PLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: EV SUPERCHARGING STATION
ACTIVITY NO: TD-DEV-0626-00141
ADDRESS: 555 E GRANT RD
ZONING: COMMERCIAL ZONE (C-1)
LAND USE: PARKING/UTILITY SERVICE
6.29.2026

THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING, PER-THE-CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM).

RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Replace any plant material that may be destroyed during the installation of the charging stations. Replace like for like or at a 1 to 1 ratio and water the new plants with the existing underground drip irrigation system. This information can be shown on a detailed site plan. Plant symbol, plant species, gallon size, planting details, etc. will be required prior to approval. If the plants will not be disturbed, then disregard this comment.

Thank you.
Chad Keller, PLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
06/11/2026 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Jeffrey W. Cassidy, Planner
Planning & Development Services Department – Current Zoning Review Section

PROJECT: TD-DEV-0626-00141 – Commercial – Tesla Supercharger Station
555 E GRANT RD TUCSON, AZ 85705 (C-1 Zoning)
Commercial Site Plan Review – 1st Review

TRANSMITTAL DATE: June 11, 2026

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-8753

This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above.

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June, 04, 2027.

1. COMMENT: PROVIDE A PARKING TABLE FOR THE SHOPPING CENTER DELINEATING THE BREAKOUT OF EACH PRESENT USE AND THEIR RESPECTIVE REQUIRED PARKING TOTALS. THIS, TO DETERMINE HOW THE CONVERSION OF (18) EXISTING PARKING STALLS WILL AFFECT THE EXISTING NEEDS OF THE EXISTING USERS.

2. COMMENT: UPDATE INCOMPLETE (TBD) UNDER GENERAL NOTES AND PROJECT CONTACTS ON THE C-001 SHEET.

3. COMMENT: REMOVE LIANNE EVANS AS THE PDSD CONTACT AS SHE NO LONGER WORKS FOR THE CITY.

4. COMMENT: REFER TO SITE ENGINEERING REVIEWERS COMMENTS.

5. COMMENT: ADDITIONAL COMMENTS MAY BE FORTHCOMING ON THE NEXT REVIEW BASED ON RESPONSES TO ZONING AND OTHER THE PDSD REVIEWER COMMENTS.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:
1. Corrected building permit
2. Provide a detailed response letter with your submittal that clearly shows how you have addressed all Zoning comments.

To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home .

Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/old-pdfs/double-old/resubmittals.pdf

If you have any questions about this transmittal, please contact jeffrey.cassidy@tucsonaz.gov

The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code .
06/11/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added Addressing, ADOT, Historic, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to Addressing nad ADOT.  FYI email sent to TEP, PAG, USPS, SWG.
 
CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
06/11/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
06/16/2026 External Reviewers - Pima County Addressing Standard REVIEW COMPLETED Good afternoon,

Pima County Addressing approves TD-DEV-0626-00141, please note that the new address for the project will be 525 E Grant Rd.


Thank you,







David Wilging

Planner I - Addressing Division

Pima County Development Services

201 N. Stone Avenue 1st Floor

Tucson, Arizona 85701

520-724-6381
06/11/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
06/11/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED CDRC sent FYI email sent to TEP, PAG, USPS, SWG. No further action is required.
06/11/2026 OK to Submit - Zoning Fast REVIEW COMPLETED
06/15/2026 ROW Review REVIEW COMPLETED