Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0625-00167
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/23/2025 | NPPO Standard | APPROVED | The NPPO Waiver for exception is approved. See site zoning comment number 2 for activity number placement on all applicable sheets including the NPPO Waiver. SITE ZONING COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-0625-00167, adjacent to the title block on each sheet. Thank you. Chad Keller, RLA chad.keller@tucsonaz.gov |
||
| 07/23/2025 | Site Engineering Standard | APPROVED | |||
| 08/06/2025 | Historic Standard | NOT REQUIRED | |||
| 07/23/2025 | Site Landscape Standard | NOT REQUIRED | |||
| 07/22/2025 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL FROM: Bobby Parsons PDSD Zoning Review Section PROJECT: 310 N. Commerce Park Lp. Tucson, AZ 85745 (PAD-4) Development Package (1st Review) TD-DEV-0625-00167 TRANSMITTAL DATE: 7/22/2025 DUE DATE: 7/21/2025 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June 20, 2026. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) 2-06.3.0 FORMAT REQUIREMENTS CONTENT REQUIREMENTS 2-06.4.2 - The title block shall include the following information and be provided on each sheet: 2-06.4.2.B - A brief legal description and a statement as to whether the project is a re-subdivision are to be provided. On re-subdivisions, provide the recording information of the existing subdivision plat; 1. COMMENT: 2-06.4.2.B – Please provide a brief legal description as noted by the standard above. 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 2. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-0625-00167, adjacent to the title block on each sheet. 2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and, 3. COMMENT: 2-06.4.4.B – Please include the information as noted by the standard above (IE: Label Santa Cruz River, N. Commerce Park Lp.). 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. Zoning and Land Use Notes 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 4. COMMENT: 2-06.4.7.A.4 – Please include all applicable UDC sections for the existing uses as noted by the standard above. 2-06.4.7.A.8 - For development package documents provide: 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 2-06.4.8.B - All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided. 5. COMMENT: 2-06.4.8.B – Please provide the recordation information for all easements and include if they are public or private as noted by the standard above. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2-06.4.9.H.4 - Indicate if existing streets are public or private; provide street names, widths, curbs, sidewalks, and utility locations, all fully dimensioned. 6. COMMENT: 2-06.4.9.H.4 – Please include the street information as noted by the standard above. 2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC. 7. COMMENT: 2-06.4.9.H.5 – Please clearly dimension all PAALs within the proposed scope of work as noted by the standard above. 2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s). 8. COMMENT: 2-06.4.9.Q – Please label the square footage and height of each proposed canopy within the footprint of the structure as noted by the standard above. ***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf |
||
| 06/20/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 06/27/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added TEP to the workflow. Review request email sent to TEP. | ||
| 07/22/2025 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 08/12/2025 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | 4350 E. Irvington Road Post Office Box 711, Tucson, AZ 85702 August 12, 2025 WO#T155842 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Installation of PV solar canopies TD-DEV-0625-00167 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 6/27/2025. There are existing facilities within the development which are depicted upon the plan. There are no apparent conflicts at this time. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Fred Quintero (520) 235-6329 fquintero@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 07/20/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 06/23/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 06/26/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 07/02/2025 | ROW Engineering Review Standard | REVIEW COMPLETED | |||
| 07/01/2025 | ROW Review | REVIEW COMPLETED |