Permit Number: TD-DEV-0625-00166
Parcel: 13205006A

Address:
3225 E 36TH ST

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0625-00166
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/08/2025 NPPO Standard NOT REQUIRED
08/08/2025 Site Landscape Standard NOT REQUIRED
08/11/2025 Site Engineering Standard REQUIRES RESUBMIT 1. See zoning Comments

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
08/06/2025 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM:
Bobby Parsons
PDSD Zoning Review Section

PROJECT:
3225 E. 36th St. Tucson, AZ 85713 (I-2 zone)
Development Package (1st Review)
TD-DEV-0625-00166

TRANSMITTAL DATE: 8/6/2025
DUE DATE: 8/5/2025

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is July 9, 2026.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

1. COMMENT: 2-06.4.3 – Please provide the development package case number, TD-DEV-0625-00166, adjacent to the title block on each sheet.

2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan.

2. COMMENT: 2-06.4.7.A.6 – Include a note stating “this project is designed to meet the overlay zone(s) criteria. UDC Article 5.4 Major Streets and Routes Setback Zone (MS&R).

2-06.4.7.A.8 - For development package documents provide:

2-06.4.7.A.8.c - Percentage of building, lot area, or vehicular use area expansion. If the building(s) or lot area have been previously expanded, those calculations shall be included; and,

3. COMMENT: 2-06.4.7.A.8.c – Please include the expansion calculations as noted by the standard above.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

4. COMMENT: 2-06.4.9.Q – Please provide the height of the proposed concrete pad as noted by the standard above. The proposed use is storage however the concrete pad has an irregular shape. Please clarify why the concrete pad has this irregular shape.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations

If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
07/15/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added Addressing, TAA, TEP, and ADOT,. USPS, SWG and PAG to the workflow. Review request email sent to TAA, TEP, and ADOT. FYI email sent to PAG, USPS, SWG.
08/05/2025 Commercial Plumbing Standard REVIEW COMPLETED
07/21/2025 External Reviewers - Arizona Department of Transportation (ADOT) Standard REVIEW COMPLETED Good Afternoon

ADOT has no comments on this DEV,

Thank you for the opportunity to review.

On Tue, Jul 15, 2025 at 9:29 AM
07/15/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
07/15/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/07/2025 External Reviewers - Tucson Airport Authority Standard REVIEW COMPLETED August 5, 2025
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-0625-00166, 1
st Submittal, Desert Metals Expansion, 3225 E 36th St, Tucson, AZ.
85713, Received July 15, 2025
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-0625-00166, 1
st Submittal, a
development package for a new concrete pad at 3225 E 36th Street. This development is
located in the N.W quarter of the N.W. quarter of Section 28, Township 14S, Range 14E, of the
Gila and Salt River Meridian. The development site occupies parcel number 132-05-006A,
covers approximately 6.02 ± acres, and is zoned as Heavy Industrial Zone (I-2). The nearest
major roadway intersection is East 36
th Street and South Country Club Road, approximately
1,200 feet to the southwest of the subject development.
This site does lie within the Tucson International Airport avigation easement requirements and
public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
The Tucson Airport Authority approves the project and is not requiring a resubmittal of this
project.
Although this project does not propose a change in plan designation or zoning the Tucson
Airport Authority highly recommends the applicant add the following notes into the general notes
of the revised development plan. This project is located approximately 4.14 miles northeast of
Tucson International Airport and is within FAA traffic pattern airspace, an area which would be
subject to aircraft overflight and noise due to being in close proximity to Tucson International
Airport.
The proposed notes would provide a means of assuring that future owners and tenants of the
property are aware they are in proximity an airport and further assures the continued right of the
City of Tucson, Tucson Airport Authority, and all persons lawfully utilizing the Tucson
International Airport the right to utilize the airspace above or near the property. This would be
accomplished through the property owner recording the Avigation Easement and providing the
Airport Disclosure Statement to the new residents of all residential uses. The Tucson Airport
Authority believes the proposed note helps to support the City of Tucson Airport Environs
Overlay Zone and supports Plan Tucson – Regional and Global Positioning policy 4 (RG-4).
1. "That prior to the City's approval of the proposed development, the property owner must
record the Avigation Easement that discloses the existence and operational
characteristics of the Tucson International Airport to future owners or tenants of the
property and further conveys the right to the public to lawfully use the airspace above the
property. The Avigation Easement shall be recorded in a manner with the Pima County
recorder which shall document it as having title liability. The content of such documents
shall be according to the form and instructions provided.”
The current property owner or person authorized to sign on behalf of the current property
owner must complete, sign, and record the Avigation Easement. Please record the
Avigation Easement with the Pima County Recorder’s Office. Then send a complete
copy of the recorded easement document to Tucson Airport Authority by either email
(send to srobidoux@flytucson.com) or to the mailing address provided below.
Scott Robidoux
Manager of Planning
Tucson Airport Authority
7250 South Tucson Blvd, Suite 300
Tucson, AZ 85756”
2. Applicable to residential uses only
“The property owner/developer/applicant must provide the Airport Disclosure Statement
form, at time of sale, to the new property owners with all new unit purchases. In the
event the development of any residential uses does not involve the sale of new units but
is instead offering rental residential units to the public, the new tenant of the rental unit
must be provided a copy of the Airport Disclosure Statement form. The intent of the
Airport Disclosure Statement form is to educate and notify the new residents that they
are living near an airport. The content of such documents shall be according to the form
and instructions provided.”
The property owner (for itself or its tenants) shall forward a signed copy of the Airport
Disclosure Statement form to the Tucson Airport Authority within ten (10) days of
signature, using the Scott Robidoux mailing address provided above.
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
cc file
08/12/2025 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED 4350 E. Irvington Road
Post Office Box 711, Tucson, AZ 85702
July 29, 2025
WO#T157044
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Desert Metals Expansion
TD-DEV-0625-00166
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 7/15/2025. There are existing facilities within the development which are
depicted upon the plan. No apparent Conflicts. Exisitng Design WO#T144776
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Salazar
(520) 305-6713
msalazar@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
07/15/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/02/2025 Fire New Construction Standard REVIEW COMPLETED
07/14/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
07/09/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
07/18/2025 ROW Engineering Review Standard REVIEW COMPLETED